Design of a 270-foot pin connected double track bridge
Thesis (B.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1924.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/103200 |
_version_ | 1826188862016192512 |
---|---|
author | Chen, Chung W |
author2 | H. L. Bowman. |
author_facet | H. L. Bowman. Chen, Chung W |
author_sort | Chen, Chung W |
collection | MIT |
description | Thesis (B.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1924. |
first_indexed | 2024-09-23T08:06:11Z |
format | Thesis |
id | mit-1721.1/103200 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T08:06:11Z |
publishDate | 2016 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/1032002019-04-09T16:39:49Z Design of a 270-foot pin connected double track bridge Design for a pin-connected truss, double track, through railroad bridge Chen, Chung W H. L. Bowman. Massachusetts Institute of Technology. Department of Civil and Environmental Engineering Civil and Environmental Engineering Thesis (B.S.)--Massachusetts Institute of Technology, Dept. of Civil Engineering, 1924. by Chung W. Chen. B.S. 2016-06-22T17:46:22Z 2016-06-22T17:46:22Z 1924 Thesis http://hdl.handle.net/1721.1/103200 37388557 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 25, [2] leaves application/pdf Massachusetts Institute of Technology |
spellingShingle | Civil and Environmental Engineering Chen, Chung W Design of a 270-foot pin connected double track bridge |
title | Design of a 270-foot pin connected double track bridge |
title_full | Design of a 270-foot pin connected double track bridge |
title_fullStr | Design of a 270-foot pin connected double track bridge |
title_full_unstemmed | Design of a 270-foot pin connected double track bridge |
title_short | Design of a 270-foot pin connected double track bridge |
title_sort | design of a 270 foot pin connected double track bridge |
topic | Civil and Environmental Engineering |
url | http://hdl.handle.net/1721.1/103200 |
work_keys_str_mv | AT chenchungw designofa270footpinconnecteddoubletrackbridge AT chenchungw designforapinconnectedtrussdoubletrackthroughrailroadbridge |