Run 2 upgrades to the CMS Level-1 calorimeter trigger
The CMS Level-1 calorimeter trigger is being upgraded in two stages to maintain performance as the LHC increases pile-up and instantaneous luminosity in its second run. In the first stage, improved algorithms including event-by-event pile-up corrections are used. New algorithms for heavy ion running...
Main Authors: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Other Authors: | |
Format: | Article |
Language: | en_US |
Published: |
IOP Publishing
2017
|
Online Access: | http://hdl.handle.net/1721.1/108482 https://orcid.org/0000-0002-7945-005X https://orcid.org/0000-0003-4511-0855 https://orcid.org/0000-0003-3681-0649 |