Use of a simulation game and queuing model to achieve shorter lead times in stamping die development
Thesis (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1996, and Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1996.
Main Author: | Kelly, Brian J |
---|---|
Other Authors: | Charles H. Fine, Daniel Whitney. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/10923 |
Similar Items
-
A comparative analysis of best practice in the manufacture of hard dies for automotive stamping operations
by: Drees, Franz Richard
Published: (2005) -
Simulation and optimization of dynamic resource allocation strategies in a single server queu[e]ing network
by: Zone, Douglas Davidson
Published: (2005) -
Priority queuing for raw material receiving
by: Bower, Andrew D. (Andrew Douglas)
Published: (2014) -
Supplier relationships within the Argentine automotive industry : stamping strategies and the role of the steel industry
by: Montero, Oscar
Published: (2005) -
Applying lean manufacturing in an automotive stamping plant
by: Welnick, Richard J. (Richard John), 1968-
Published: (2014)