Developing flexibility through alternative project delivery methods for the U.S. Army Corps of Engineers project management business process
Thesis: S.M. in Engineering and Management, Massachusetts Institute of Technology, System Design and Management Program, 2018.
Main Author: | Williams, Brian T. (Brian Thomas) |
---|---|
Other Authors: | Richard de Neufville. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2018
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/118509 |
Similar Items
-
A systems analysis of U.S. Army operation assessments
by: Joo, Delbert S
Published: (2018) -
Investigating the U.S. Army's Human Dimension Strategy
by: Song, Steven C
Published: (2017) -
Alternative contracting methods in the U.S. Army Corps of Engineers
by: Simoneau, Craig L. (Craig Lance)
Published: (2009) -
Teamwork behaviors at mesoscale : meaningful explorations of tradespace during project design
by: Tan, Puay Siang
Published: (2018) -
A new project management system dynamics model and simulator
by: Gozluklu, Burak
Published: (2018)