New operator assistance features in the CMS Run Control System

During Run-1 of the LHC, many operational procedures have been automated in the run control system of the Compact Muon Solenoid (CMS) experiment. When detector high voltages are ramped up or down or upon certain beam mode changes of the LHC, the DAQ system is automatically partially reconfigured wit...

Full description

Bibliographic Details
Main Authors: Andre, J-M, Behrens, U, Branson, J, Brummer, P, Chaze, O, Cittolin, S, Contescu, C, Craigs, B G, Darlea, G-L, Deldicque, C, Darlea, Georgiana-Lavinia, Demiragli, Z, Dobson, M, Doualot, N, Erhan, S, Fulcher, J R, Gigi, D, Gładki, M, Glege, F, Gomez-Ceballos, Guillelmo, Hegeman, J, Holzner, A, Janulis, M, Jimenez-Estupiñán, R, Masetti, L, Meijers, F, Meschi, E, Mommsen, R K, Morovic, S, O’Dell, V, Orsini, L, Paus, Christoph M. E., Petrova, P, Pieri, M, Racz, A, Reis, T, Sakulin, H, Schwick, C, Simelevicius, D, Vougioukas, M, Zejdl, P
Other Authors: Massachusetts Institute of Technology. Department of Physics
Format: Article
Language:English
Published: IOP Publishing 2019
Online Access:https://hdl.handle.net/1721.1/121943

Similar Items