CMS DAQ Current and Future Hardware Upgrades up to Post Long Shutdown 3 (LS3) Times
Following the first LHC collisions seen and recorded by CMS in 2009, the DAQ hardware went through a major upgrade during LS1 (2013-2014) and new detectors have been connected during 2015-2016 and 2016-2017 winter shutdowns. Now, LS2 (2019-2020) and LS3 (2024-mid 2026) are actively being prepared. T...
Similar Items
-
Operational experience with the new CMS DAQ-Expert
by: Andre Jean-Marc, et al.
Published: (2019-01-01) -
The CMS DAQ Pinball Machine
by: Cornu Cynthia, et al.
Published: (2020-01-01) -
The FEROL40, a microTCA card interfacing custom point-to-point links and standard TCP/IP
by: Gigi, Dominique, et al.
Published: (2021) -
Automating the CMS DAQ
by: Bauer, Gerry P, et al.
Published: (2019) -
A Scalable Online Monitoring System Based on Elasticsearch for Distributed Data Acquisition in Cms
by: Andre, Jean-Marc, et al.
Published: (2022)