A model for predicting and managing a production ramp-up of a new product
Thesis (M.S.)--Massachusetts Institute of Technology, Sloan School of Management, 1992 and (M.S.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 1992.
Main Author: | Casamento, James William |
---|---|
Other Authors: | George Chryssolouris and Alfredo M. Kofman. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/12781 |
Similar Items
-
Process improvements during production ramp-up
by: Chew, Ryan W. (Ryan Wayne)
Published: (2007) -
The technology treadmill : managing product performance and production ramp-up in fast-paced industries
by: Joglekar, Nitindra R
Published: (2005) -
Tape automated bonding--product and process ramp-up
by: Samuels, Benjamin R. (Benjamin Richard)
Published: (2005) -
Change management, production ramp up and the sustainable supply chain in the transportation industry
by: Fortin, Sean (Sean Dubé)
Published: (2009) -
Production management policies in a multiple product semiconductor fabrication facility
by: Perrin, Susan E. (Susan Elaine)
Published: (2008)