Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects

Oil and gas companies face multiple uncertainties when designing and implementing capital projects. Capital heavy projects with long-time horizons face various uncertainties that are difficult to predict and mitigate. Numerous ways of dealing with these uncertainties exist: decision analysis, real o...

Full description

Bibliographic Details
Main Author: Yemets, Serhiy Y.
Other Authors: de Neufville, Richard
Format: Thesis
Published: Massachusetts Institute of Technology 2022
Online Access:https://hdl.handle.net/1721.1/140075
https://orcid.org/0000-0001-8354-1280
_version_ 1826198262711844864
author Yemets, Serhiy Y.
author2 de Neufville, Richard
author_facet de Neufville, Richard
Yemets, Serhiy Y.
author_sort Yemets, Serhiy Y.
collection MIT
description Oil and gas companies face multiple uncertainties when designing and implementing capital projects. Capital heavy projects with long-time horizons face various uncertainties that are difficult to predict and mitigate. Numerous ways of dealing with these uncertainties exist: decision analysis, real options, flexibility in engineering design, and economic discounted cash flow models. The question remains of what is the most effective way of dealing with uncertainties. Decision analysis is utilized to understand possible risks and evaluate the decision quality of a project. It addresses uncertainties in the later stages of the project once the design has been completed. Flexibility in engineering design also deals with uncertainty, principally during the design phase of the project. It enables the architecture of the projects to respond to changing circumstances easily and cost-effectively. This thesis compares and contrasts flexibility in engineering design and its usefulness with decision analysis and discounted cash flow analyses. It focuses on how these methods address uncertainty and compares the project results that received uncertainty treatment during the decision analysis phase with project results where uncertainty is addressed during the project design phase. We examine a hypothetical project case applying methodologies and compare deterministic and probabilistic project models. The recommendation is to utilize flexibility in engineering design for projects that face high uncertainty. Addressing uncertainty early in the project design phase could deliver the most value compared to uncertainty treatment in a later project phase. Flexibility in engineering design is not a substitute for a complex project model. While it could be difficult to select among various flexible designs, they often could perform better. Still, it is easy to utilize, allows for better development of the complex economic model, and simplifies decision analysis as uncertainty valuations have been completed early in the project design stage.
first_indexed 2024-09-23T11:02:02Z
format Thesis
id mit-1721.1/140075
institution Massachusetts Institute of Technology
last_indexed 2024-09-23T11:02:02Z
publishDate 2022
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/1400752022-02-08T03:46:45Z Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects Yemets, Serhiy Y. de Neufville, Richard System Design and Management Program. System Design and Management Program. Oil and gas companies face multiple uncertainties when designing and implementing capital projects. Capital heavy projects with long-time horizons face various uncertainties that are difficult to predict and mitigate. Numerous ways of dealing with these uncertainties exist: decision analysis, real options, flexibility in engineering design, and economic discounted cash flow models. The question remains of what is the most effective way of dealing with uncertainties. Decision analysis is utilized to understand possible risks and evaluate the decision quality of a project. It addresses uncertainties in the later stages of the project once the design has been completed. Flexibility in engineering design also deals with uncertainty, principally during the design phase of the project. It enables the architecture of the projects to respond to changing circumstances easily and cost-effectively. This thesis compares and contrasts flexibility in engineering design and its usefulness with decision analysis and discounted cash flow analyses. It focuses on how these methods address uncertainty and compares the project results that received uncertainty treatment during the decision analysis phase with project results where uncertainty is addressed during the project design phase. We examine a hypothetical project case applying methodologies and compare deterministic and probabilistic project models. The recommendation is to utilize flexibility in engineering design for projects that face high uncertainty. Addressing uncertainty early in the project design phase could deliver the most value compared to uncertainty treatment in a later project phase. Flexibility in engineering design is not a substitute for a complex project model. While it could be difficult to select among various flexible designs, they often could perform better. Still, it is easy to utilize, allows for better development of the complex economic model, and simplifies decision analysis as uncertainty valuations have been completed early in the project design stage. S.M. 2022-02-07T15:22:35Z 2022-02-07T15:22:35Z 2021-09 2021-10-21T19:59:31.446Z Thesis https://hdl.handle.net/1721.1/140075 https://orcid.org/0000-0001-8354-1280 In Copyright - Educational Use Permitted Copyright retained by author(s) https://rightsstatements.org/page/InC-EDU/1.0/ application/pdf Massachusetts Institute of Technology
spellingShingle Yemets, Serhiy Y.
Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects
title Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects
title_full Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects
title_fullStr Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects
title_full_unstemmed Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects
title_short Comparison of Discounted Cash Flow, Decision Analysis, and Flexibility in Design for handling uncertainty in Oil and Gas Capital Projects
title_sort comparison of discounted cash flow decision analysis and flexibility in design for handling uncertainty in oil and gas capital projects
url https://hdl.handle.net/1721.1/140075
https://orcid.org/0000-0001-8354-1280
work_keys_str_mv AT yemetsserhiyy comparisonofdiscountedcashflowdecisionanalysisandflexibilityindesignforhandlinguncertaintyinoilandgascapitalprojects