Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981

Prepared under the support of Virginia Electric and Power Company, Richmond, Virginia.

Bibliographic Details
Main Authors: Wells, Scott A., Adams, E. Eric, Harleman, Donald R. F.
Published: Cambridge, Mass. : Ralph M. Parsons Laboratory, Aquatic Sciences and Environmental Engineering, Dept. of Civil Engineering, School of Engineering, Massachusetts Institute of Technology 2022
Online Access:https://hdl.handle.net/1721.1/143013
_version_ 1826196329218441216
author Wells, Scott A.
Adams, E. Eric
Harleman, Donald R. F.
author_facet Wells, Scott A.
Adams, E. Eric
Harleman, Donald R. F.
author_sort Wells, Scott A.
collection MIT
description Prepared under the support of Virginia Electric and Power Company, Richmond, Virginia.
first_indexed 2024-09-23T10:25:12Z
id mit-1721.1/143013
institution Massachusetts Institute of Technology
last_indexed 2024-09-23T10:25:12Z
publishDate 2022
publisher Cambridge, Mass. : Ralph M. Parsons Laboratory, Aquatic Sciences and Environmental Engineering, Dept. of Civil Engineering, School of Engineering, Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/1430132022-06-14T03:34:15Z Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981 Wells, Scott A. Adams, E. Eric Harleman, Donald R. F. Prepared under the support of Virginia Electric and Power Company, Richmond, Virginia. The North Anna Power Station (3 proposed nuclear units with a total capacity of 2820MWe) is located in the State of Virginia about 41 miles northwest of Richmond. The plant condenser heat dissipation system consists of a complex geometric arrangement including a Waste Heat Treatment Facility (WHTF), consisting of a series of separate ponds with attached dead-end side arms, and Lake Anna which is a deep reservoir created by impounding the North Anna River. A segmented mathematical model was used to simulate thermal structure within the Lake Anna system. Initial model development, calibration based on pre-operational data (1977-1976), and predictions under station operation for the historical period 1957-1966 are documented in Jirka et al (1977). Since Unit 1 came on line in the Summer of 1978 and Unit 2 in Fall of 1980, an extensive data collection effort was undertaken to calibrate the model to operational data. Continuous measurements were made of meteorological variables, plant load, water temperature at various points in the system and current speeds in one of the WHTF side-arms. Supplemental data, with greater spatial resolution, were collected at weekly or monthly intervals. Calibration of the model included examination of assumptions inherent in the model development and refinement of model coefficients. Major areas of investigation included surface heat transfer processes (short wave solar radiation, long-wave atmospheric radiation and evaporation), dilution and entrance mixing, dead end side arm flow dynamics, vertical diffusion of heat below the well-mixed upper layer in the main lake, and linkage of the WHTF calculations with those of the main lake. Comparison against a three year period of operational data (1978-1981) showed that the model predictions were very accurate. An error analysis detailed explicitly the model's strengths and weaknesses, with mean surface errors (prediction-data) ranging from + 0.9 �F to-0.4 �F at four diagnostic control points and standard error ranging from 2.8 �F to 1.8 �F. Excellent agreement was also found in the vertical temperature profiles in the main lake. After verification, the model was used in a predictive mode to simulate temperatures for 1, 2 and 3 nuclear units under a range of meteorological conditions. Synthetic meteorological data had previously been prepared for the ten year period, 1957-1966, by means of a regionalization procedure. Temperature predictions for this ten year period could then be used to characterize both average and extreme conditions. During extremely warm periods (e.g., the Summer of 1959), the temperature of water released from Lake Anna to the N. Anna River downstream would have exceeded the present temperature standard of 89.6 �F (32 �C). A one-dimensional river temperature model was developed to predict downstream temperatures. Furthermore, several possibilities for reducing downstream temperatures were examined including: (i) dilution reduction in the WHTF, (ii) rerouting of the flow through the WHTF sidearms, (iii) reduction in condenser flow rate, (iv) bubble aerators in the main lake, and (v) a siphon to mix hypolimnetic cool water with warm surface water for discharge into the N. Anna River. For the siphon, which appears to be the most efficient option, simulations were performed to identify the maximum flow rate and the total volume of hypolimnetic water withdrawn, in order to comply with downstream temperature standards in each of the ten years simulated. 2022-06-13T13:09:40Z 2022-06-13T13:09:40Z 1982-03 272 https://hdl.handle.net/1721.1/143013 9560726 241284 R (Massachusetts Institute of Technology. Department of Civil Engineering) ; 82-22. Report (Ralph M. Parsons Laboratory for Water Resources and Hydrodynamics) ; 272. application/pdf Cambridge, Mass. : Ralph M. Parsons Laboratory, Aquatic Sciences and Environmental Engineering, Dept. of Civil Engineering, School of Engineering, Massachusetts Institute of Technology
spellingShingle Wells, Scott A.
Adams, E. Eric
Harleman, Donald R. F.
Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981
title Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981
title_full Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981
title_fullStr Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981
title_full_unstemmed Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981
title_short Calibration and Verification of the Cooling Lake Model for North Anna Power Station: During the Period July 1978 - September 1981
title_sort calibration and verification of the cooling lake model for north anna power station during the period july 1978 september 1981
url https://hdl.handle.net/1721.1/143013
work_keys_str_mv AT wellsscotta calibrationandverificationofthecoolinglakemodelfornorthannapowerstationduringtheperiodjuly1978september1981
AT adamseeric calibrationandverificationofthecoolinglakemodelfornorthannapowerstationduringtheperiodjuly1978september1981
AT harlemandonaldrf calibrationandverificationofthecoolinglakemodelfornorthannapowerstationduringtheperiodjuly1978september1981