QuickFlex: a Fast Algorithm for Flexible Region Construction for the TSO-DSO Coordination
Main Authors: | Lopez, Luis, Gonzalez-Castellanos, Alvaro, Pozo, David, Roozbehani, Mardavij, Dahleh, Munther |
---|---|
Other Authors: | Massachusetts Institute of Technology. Institute for Data, Systems, and Society |
Format: | Article |
Language: | English |
Published: |
Institute of Electrical and Electronics Engineers (IEEE)
2022
|
Online Access: | https://hdl.handle.net/1721.1/143102 |
Similar Items
-
Deferrable loads in an energy market: Coordination under congestion constraints
by: Materassi, Donatello, et al.
Published: (2015) -
Asymptotic Network Robustness
by: Sarkar, Tuhin, et al.
Published: (2020) -
On the economic value and price-responsiveness of ramp-constrained storage
by: Faghih, Ali, et al.
Published: (2016) -
Minimal Realization Problems for Jump Linear Systems
by: Sarkar, Tuhin, et al.
Published: (2019) -
Battery capacity of deferrable energy demand
by: Madjidian, Daria, et al.
Published: (2017)