Economic-environmental-security transform curves of electric power system production schedules and simulations
Prepared in association with Electric Power Systems Engineering Laboratory and Dept. of Civil Engineering, M.I.T
Main Author: | |
---|---|
Format: | Technical Report |
Language: | en_US |
Published: |
MIT Energy Lab
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/27242 |
_version_ | 1811079525154422784 |
---|---|
author | Gruhl, Jim |
author_facet | Gruhl, Jim |
author_sort | Gruhl, Jim |
collection | MIT |
description | Prepared in association with Electric Power Systems Engineering Laboratory and Dept. of Civil Engineering, M.I.T |
first_indexed | 2024-09-23T11:16:26Z |
format | Technical Report |
id | mit-1721.1/27242 |
institution | Massachusetts Institute of Technology |
language | en_US |
last_indexed | 2024-09-23T11:16:26Z |
publishDate | 2005 |
publisher | MIT Energy Lab |
record_format | dspace |
spelling | mit-1721.1/272422019-04-12T08:40:39Z Economic-environmental-security transform curves of electric power system production schedules and simulations Gruhl, Jim Production scheduling Electric power-plants -- Environmental aspects Electric power-plants -- Costs Electric power production Prepared in association with Electric Power Systems Engineering Laboratory and Dept. of Civil Engineering, M.I.T A quasi-optimal technique ('quasi' in that the technique discards unreaonable optimums), realized by a dynamially evolving mixed integer program, is used to develop regional electric power maintenanee and production sample schedules, as well as unit commitment sample schedules. This sophisticated, yet omputationally feasible, method is used to develop the bulk dispatch schedules required to meet electric power demands at various preset reliability levels while oentrolling the associated dollar and environmental impact consequences. This report considers a hypothetical system of about twelve power plants situated close to one another on the same river system. The maintenance and unit commitment scheduling mechanisms are used to display the tradeoffs which exist between the economic costs, environmental consequences and reliability levels of all possible optimum schedules. These tradeoff, or transform, surfaces are generated from acoul schedules for system opertio. Also generated is a sample system imulation. Three possible generation expansion plans are compared and their potential operating performances are displayed. These specifically hypothesized expansion plans were tested os two different possible future load demand curves. The results show that there is great value in the use of an accurate dollar and environmental impact simulator. Hypothetical data has been used, but effort has been made to make this data as representl&tve as possible. The results of this project show that a great amount of flexibility is available to both the operations scheduler and the system expansion planner, and that the dollar costs, water and air pollution impacts cover a wide range of consequences. These results also show that S.'i.opkebably very wasteful to operate or plan a system using any simple, single- minded measure of desirability as a decision making strategy. 2005-09-15T14:28:27Z 2005-09-15T14:28:27Z 1973 Technical Report 13433806 http://hdl.handle.net/1721.1/27242 en_US MIT-EL 73-006 4369566 bytes application/pdf application/pdf MIT Energy Lab |
spellingShingle | Production scheduling Electric power-plants -- Environmental aspects Electric power-plants -- Costs Electric power production Gruhl, Jim Economic-environmental-security transform curves of electric power system production schedules and simulations |
title | Economic-environmental-security transform curves of electric power system production schedules and simulations |
title_full | Economic-environmental-security transform curves of electric power system production schedules and simulations |
title_fullStr | Economic-environmental-security transform curves of electric power system production schedules and simulations |
title_full_unstemmed | Economic-environmental-security transform curves of electric power system production schedules and simulations |
title_short | Economic-environmental-security transform curves of electric power system production schedules and simulations |
title_sort | economic environmental security transform curves of electric power system production schedules and simulations |
topic | Production scheduling Electric power-plants -- Environmental aspects Electric power-plants -- Costs Electric power production |
url | http://hdl.handle.net/1721.1/27242 |
work_keys_str_mv | AT gruhljim economicenvironmentalsecuritytransformcurvesofelectricpowersystemproductionschedulesandsimulations |