The design and implementation of a demonstration supplementary control system, February 1, 1974-July 31, 1976 : interim final report
This report documents the progress made during the six-month Phase I portion of a project to design and implement a Supplementary Control System on four coal-burning power plants in western Pennsylvania. Preliminary data collection and analysis, air quality modeling, meteorological forecasting,...
Main Author: | Ruane, M. |
---|---|
Format: | Technical Report |
Language: | en_US |
Published: |
MIT Energy Lab
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/27277 |
Similar Items
-
The design and implementation of a demonstration supplementary control system
by: Ruane, Michael Frederick
Published: (2011) -
Building a landscape for dwelling
by: Raphael, Michael B
Published: (2013) -
Cost evaluation of air pollution control standards
by: Ruane, Michael Frederick
Published: (2005) -
Evaluation of health effects of air pollution in the Chestnut Ridge area : preliminary analysis
by: Gruhl, Jim, et al.
Published: (2006) -
Architecture at the service of history : Pittsburgh Industrial Museum, a design proposal
by: Schaefer, August G
Published: (2013)