Reducing variability in equipment availability at Intel using systems optimization
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Manufacturing Program at MIT, 2004.
Main Author: | Kwong, William W. M |
---|---|
Other Authors: | Stephen Graves and Dimitris Bertsimas. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2006
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/34761 |
Similar Items
-
Implementation of a system of visual indicators at Intel's D2 Fab
by: Smith, Erik S. (Erik Sean), 1972-
Published: (2014) -
Equipment protective capacity optimization using discrete event simulation
by: Newlin, Anthony W
Published: (2006) -
Optical networking equipment manufacturing
by: Holman, Jason (Jason William), 1974-
Published: (2009) -
Reducing variability in a semiconductor manufacturing environment
by: Penttilä, Minja Johanna
Published: (2006) -
Managing preventative maintenance activities at Intel Corporation
by: Fearing, Rebecca Cassler
Published: (2007)