Computer simulation and analysis of production line with two unreliable full batch machines and a finite buffer
Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2006.
Main Author: | Zheng, Ying, S.B. Massachusetts Institute of Technology |
---|---|
Other Authors: | Stanley B. Gershwin. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2007
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/36818 |
Similar Items
-
Modeling and Exact Analysis of a Production Line with Two Unreliable Batch Machines and a Finite Buffer: Part I - Full Batches
by: Chang, Seok Ho, et al.
Published: (2005) -
Lead Time Distribution of Three-Machine Two-Buffer Lines with Unreliable Machines and Finite Buffers
by: Shi, Chuan, et al.
Published: (2016) -
Diffusion approximations for three-stage transfer lines with unreliable machines and finite buffers
Published: (2003) -
Diffusion approximations of transfer lines with unreliable machines and finite storage elements
Published: (2002) -
Efficiency and production rate of a transfer line with two machines and a finite storage buffer
Published: (2002)