On Optimizing PSA Berth Planning System

Competition among container ports continues to increase as the differentiation of hub ports and feeder ports progresses. Managers in many container terminals are trying to attract carriers by automating handling equipment, providing and speeding up various services, and furnishing the most current i...

Full description

Bibliographic Details
Main Authors: Teo, Chung Piaw, Dai, Jim, Moorthy, Rajeeva Lochana
Format: Article
Language:en_US
Published: 2003
Subjects:
Online Access:http://hdl.handle.net/1721.1/3720
_version_ 1826195028135903232
author Teo, Chung Piaw
Dai, Jim
Moorthy, Rajeeva Lochana
author_facet Teo, Chung Piaw
Dai, Jim
Moorthy, Rajeeva Lochana
author_sort Teo, Chung Piaw
collection MIT
description Competition among container ports continues to increase as the differentiation of hub ports and feeder ports progresses. Managers in many container terminals are trying to attract carriers by automating handling equipment, providing and speeding up various services, and furnishing the most current information on the flow of containers. At the same time, however, they are trying to reduce costs by utilizing resources efficiently, including human resources, berths, container yards, quay cranes, and various yard equipment. When planning berth usage, the berthing time and the exact position of each vessel at the wharf, as well as various quay side resources are usually determined in the process. Several variables must be considered, including the length overall (LOA) and arrival time of each vessel, the number of containers for discharging and loading, and the storage location of outbound/inbound containers to be loaded onto/discharged from the corresponding vessel. Furthermore, we aim to propose berthing plan that will be "robust", since the actual arrival time of each vessel can vary substantially from forecast. This is particular important for vessels from priority customers (called priority vessels hereon), who have been promised berth-on-arrival (i.e. within two hours of arriving) service guarantee in their contract with PSA. A robust plan will also helps to minimize the frequent updates (changes) to berthing plan that have repercussion in resource and sta deployment within the terminal. Thus, the problem reduces to one of finding a berthing plan, so that priority vessels can be berthed-on-arrival with high probability, and the vessels can be berthed as close to their preferred locations as possible, to reduce the cost of transporting the containers within the terminal. In this paper, we described an approach to address this problem.
first_indexed 2024-09-23T10:05:36Z
format Article
id mit-1721.1/3720
institution Massachusetts Institute of Technology
language en_US
last_indexed 2024-09-23T10:05:36Z
publishDate 2003
record_format dspace
spelling mit-1721.1/37202019-04-10T16:45:26Z On Optimizing PSA Berth Planning System Teo, Chung Piaw Dai, Jim Moorthy, Rajeeva Lochana berthing plan port management Competition among container ports continues to increase as the differentiation of hub ports and feeder ports progresses. Managers in many container terminals are trying to attract carriers by automating handling equipment, providing and speeding up various services, and furnishing the most current information on the flow of containers. At the same time, however, they are trying to reduce costs by utilizing resources efficiently, including human resources, berths, container yards, quay cranes, and various yard equipment. When planning berth usage, the berthing time and the exact position of each vessel at the wharf, as well as various quay side resources are usually determined in the process. Several variables must be considered, including the length overall (LOA) and arrival time of each vessel, the number of containers for discharging and loading, and the storage location of outbound/inbound containers to be loaded onto/discharged from the corresponding vessel. Furthermore, we aim to propose berthing plan that will be "robust", since the actual arrival time of each vessel can vary substantially from forecast. This is particular important for vessels from priority customers (called priority vessels hereon), who have been promised berth-on-arrival (i.e. within two hours of arriving) service guarantee in their contract with PSA. A robust plan will also helps to minimize the frequent updates (changes) to berthing plan that have repercussion in resource and sta deployment within the terminal. Thus, the problem reduces to one of finding a berthing plan, so that priority vessels can be berthed-on-arrival with high probability, and the vessels can be berthed as close to their preferred locations as possible, to reduce the cost of transporting the containers within the terminal. In this paper, we described an approach to address this problem. Singapore-MIT Alliance (SMA) 2003-11-24T20:39:55Z 2003-11-24T20:39:55Z 2003-01 Article http://hdl.handle.net/1721.1/3720 en_US High Performance Computation for Engineered Systems (HPCES); 12708 bytes application/pdf application/pdf
spellingShingle berthing plan
port management
Teo, Chung Piaw
Dai, Jim
Moorthy, Rajeeva Lochana
On Optimizing PSA Berth Planning System
title On Optimizing PSA Berth Planning System
title_full On Optimizing PSA Berth Planning System
title_fullStr On Optimizing PSA Berth Planning System
title_full_unstemmed On Optimizing PSA Berth Planning System
title_short On Optimizing PSA Berth Planning System
title_sort on optimizing psa berth planning system
topic berthing plan
port management
url http://hdl.handle.net/1721.1/3720
work_keys_str_mv AT teochungpiaw onoptimizingpsaberthplanningsystem
AT daijim onoptimizingpsaberthplanningsystem
AT moorthyrajeevalochana onoptimizingpsaberthplanningsystem