Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry

Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.

Bibliographic Details
Main Author: Myers, Kevin Michael
Other Authors: Stephen Graves and Deborah Nightingale.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2007
Subjects:
Online Access:http://hdl.handle.net/1721.1/39695
_version_ 1826216555486117888
author Myers, Kevin Michael
author2 Stephen Graves and Deborah Nightingale.
author_facet Stephen Graves and Deborah Nightingale.
Myers, Kevin Michael
author_sort Myers, Kevin Michael
collection MIT
description Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics; in conjunction with the Leaders for Manufacturing Program at MIT, 2007.
first_indexed 2024-09-23T16:49:31Z
format Thesis
id mit-1721.1/39695
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T16:49:31Z
publishDate 2007
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/396952022-01-28T18:35:39Z Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry Myers, Kevin Michael Stephen Graves and Deborah Nightingale. Leaders for Manufacturing Program. Leaders for Manufacturing Program at MIT Massachusetts Institute of Technology. Department of Aeronautics and Astronautics Sloan School of Management Sloan School of Management. Aeronautics and Astronautics. Leaders for Manufacturing Program. Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Aeronautics and Astronautics; in conjunction with the Leaders for Manufacturing Program at MIT, 2007. Includes bibliographical references (p. 89-90). Within the Integrated Defense Systems of The Boeing Company, aftermarket support of military aircraft serves as an increasingly large source of revenue. One of the newest contracts between Boeing and the U.S. Government created such a supply partnership at the Army Rotorcraft Repair Depot in Corpus Christi, Texas. At this depot, all Army helicopters, including Boeing's AH-64 Apache Attack helicopter and CH-47 Chinook Cargo helicopter undergo major repair and overhaul. In 2004, Boeing entered an agreement with the U.S. Government to assume responsibility of the repair depot's supply chain for aftermarket parts for Boeing rotorcraft. Over the last two years, Boeing has been creating and refining Corpus Christi's support structure to ensure that the required repair parts arrive when demanded. In establishing this new supply chain, Boeing has identified numerous inefficiencies as a result of inaccurate and highly volatile forecasts. This thesis examines the impact of volatility within the new support structure and creates flexible solutions to mitigate its negative effects on lead times, multiple sources of supply and inventory management. (cont.) Efforts to increase communication flow across the supply chain are used to capitalize on economies of scale for cost reduction while safety stock recommendations are made for critical end-items. Monte Carlo simulations are employed to justify and validate the solutions. The results of the thesis reveal that a strategic selection of raw material safety stock can reduce procurement lead times by an average 61% for a subset of parts while maintaining financial responsibility. Additionally, by leveraging cost reduction techniques, an average increase of 11% in Boeing's income from sales can be achieved while eliminating inefficient administrative delays and increasing customer fulfillment rates. These two recommendations demonstrate specific solutions for mitigating the effects of demand volatility and inaccurate forecasting. by Kevin Michael Myers. S.M. M.B.A. 2007-12-07T16:08:16Z 2007-12-07T16:08:16Z 2007 2007 Thesis http://hdl.handle.net/1721.1/39695 176070448 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 90 p. application/pdf Massachusetts Institute of Technology
spellingShingle Sloan School of Management.
Aeronautics and Astronautics.
Leaders for Manufacturing Program.
Myers, Kevin Michael
Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry
title Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry
title_full Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry
title_fullStr Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry
title_full_unstemmed Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry
title_short Building flexibility in the volatile aftermarket parts : supply chains of the defense aerospace industry
title_sort building flexibility in the volatile aftermarket parts supply chains of the defense aerospace industry
topic Sloan School of Management.
Aeronautics and Astronautics.
Leaders for Manufacturing Program.
url http://hdl.handle.net/1721.1/39695
work_keys_str_mv AT myerskevinmichael buildingflexibilityinthevolatileaftermarketpartssupplychainsofthedefenseaerospaceindustry