Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times
We report on a project with Polaroid Corporation in which we developed a supply chain model to provide decision support for planning production and transportation. Production occurs in Asia to serve world-wide demand. Production planners must determine both the production quantities as well as wheth...
Main Authors: | , |
---|---|
Format: | Article |
Language: | en_US |
Published: |
2003
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/4043 |
_version_ | 1826199474153717760 |
---|---|
author | Threatte, Kermit Graves, Stephen C. |
author_facet | Threatte, Kermit Graves, Stephen C. |
author_sort | Threatte, Kermit |
collection | MIT |
description | We report on a project with Polaroid Corporation in which we developed a supply chain model to provide decision support for planning production and transportation. Production occurs in Asia to serve world-wide demand. Production planners must determine both the production quantities as well as whether to ship by sea or by air. We develop a model to optimize a static version of this problem and then show how to use this static model in a dynamic setting. We test the model with data from Polaroid and show its effectiveness. |
first_indexed | 2024-09-23T11:20:48Z |
format | Article |
id | mit-1721.1/4043 |
institution | Massachusetts Institute of Technology |
language | en_US |
last_indexed | 2024-09-23T11:20:48Z |
publishDate | 2003 |
record_format | dspace |
spelling | mit-1721.1/40432019-04-12T08:08:40Z Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times Threatte, Kermit Graves, Stephen C. dual replenishment modes inventory and transportation planning supply chain application supply chain modeling We report on a project with Polaroid Corporation in which we developed a supply chain model to provide decision support for planning production and transportation. Production occurs in Asia to serve world-wide demand. Production planners must determine both the production quantities as well as whether to ship by sea or by air. We develop a model to optimize a static version of this problem and then show how to use this static model in a dynamic setting. We test the model with data from Polaroid and show its effectiveness. Singapore-MIT Alliance (SMA) 2003-12-23T15:29:19Z 2003-12-23T15:29:19Z 2002-01 Article http://hdl.handle.net/1721.1/4043 en_US Innovation in Manufacturing Systems and Technology (IMST); 51475 bytes application/pdf application/pdf |
spellingShingle | dual replenishment modes inventory and transportation planning supply chain application supply chain modeling Threatte, Kermit Graves, Stephen C. Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times |
title | Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times |
title_full | Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times |
title_fullStr | Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times |
title_full_unstemmed | Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times |
title_short | Tactical Shipping and Scheduling at Polaroid with Dual Lead-Times |
title_sort | tactical shipping and scheduling at polaroid with dual lead times |
topic | dual replenishment modes inventory and transportation planning supply chain application supply chain modeling |
url | http://hdl.handle.net/1721.1/4043 |
work_keys_str_mv | AT threattekermit tacticalshippingandschedulingatpolaroidwithdualleadtimes AT gravesstephenc tacticalshippingandschedulingatpolaroidwithdualleadtimes |