Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation
Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/40459 |
_version_ | 1811084306074828800 |
---|---|
author | Lampe, Erik Joseph |
author2 | Stanley Gershwin. |
author_facet | Stanley Gershwin. Lampe, Erik Joseph |
author_sort | Lampe, Erik Joseph |
collection | MIT |
description | Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007. |
first_indexed | 2024-09-23T12:48:38Z |
format | Thesis |
id | mit-1721.1/40459 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T12:48:38Z |
publishDate | 2008 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/404592019-04-12T09:50:18Z Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation Measuring impact of CONstant Work in Process control on production rate and inventory distribution for a flexible production system through simulation Lampe, Erik Joseph Stanley Gershwin. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (S.B.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007. Includes bibliographical references (leaf 30). This research investigates the production output and inventory distribution of a manufacturing system that produces multiple part types on flexible machines while incorporating CONWIP inventory controls. The production machines, which are separated by individual storage areas for each part type, are modeled as unreliable and operate according to a strict priority sequence. The maximum total inventory of each part type in the entire system is limited a preset number of tokens in the system. While varying the token levels and the demand for finished parts, the average production output for each part type and the average inventory level for each buffer is monitored to understand their behaviors. The relationship between the inventory distributions and the production rates is also investigated. The goal of this research is to develop intuition behind the system behavior. by Erik Joseph Lampe. S.B. 2008-02-27T22:27:57Z 2008-02-27T22:27:57Z 2007 2007 Thesis http://hdl.handle.net/1721.1/40459 191733231 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 30 leaves application/pdf Massachusetts Institute of Technology |
spellingShingle | Mechanical Engineering. Lampe, Erik Joseph Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation |
title | Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation |
title_full | Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation |
title_fullStr | Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation |
title_full_unstemmed | Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation |
title_short | Measuring impact of CONWIP control on production rate and inventory distribution for a flexible production system through simulation |
title_sort | measuring impact of conwip control on production rate and inventory distribution for a flexible production system through simulation |
topic | Mechanical Engineering. |
url | http://hdl.handle.net/1721.1/40459 |
work_keys_str_mv | AT lampeerikjoseph measuringimpactofconwipcontrolonproductionrateandinventorydistributionforaflexibleproductionsystemthroughsimulation AT lampeerikjoseph measuringimpactofconstantworkinprocesscontrolonproductionrateandinventorydistributionforaflexibleproductionsystemthroughsimulation |