Qualification of the IBM CSC factory in Singapore : resource estimation and allocation in software and hardware services
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007.
Main Author: | Li, Chengguang, M. Eng. Massachusetts Institute of Technology |
---|---|
Other Authors: | Stanley Gershwin. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/42324 |
Similar Items
-
Pre-engagement process improvement in IBM PC services
by: Zuo, Jie, M. Eng. Massachusetts Institute of Technology
Published: (2008) -
Design of a configuration software for IBMS
by: Yang, Fan
Published: (2016) -
Resource allocation in stochastic processing networks : performance and scaling
by: Zhong, Yuan, M. Eng. Massachusetts Institute of Technology
Published: (2013) -
Field deployment process transformation in IBM PC services
by: Fan, Siyu
Published: (2008) -
Forecasting electricity consumption using SARIMA method in IBM SPSS software
by: Sze, En Sim, et al.
Published: (2019)