The production planning and inventory management of finished goods for a pharmaceutical company

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007.

Bibliographic Details
Main Author: Gupta, Sumit, M. Eng. Massachusetts Institute of Technology
Other Authors: Stephen C. Graves.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2008
Subjects:
Online Access:http://hdl.handle.net/1721.1/42991
_version_ 1826217776295968768
author Gupta, Sumit, M. Eng. Massachusetts Institute of Technology
author2 Stephen C. Graves.
author_facet Stephen C. Graves.
Gupta, Sumit, M. Eng. Massachusetts Institute of Technology
author_sort Gupta, Sumit, M. Eng. Massachusetts Institute of Technology
collection MIT
description Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007.
first_indexed 2024-09-23T17:08:59Z
format Thesis
id mit-1721.1/42991
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T17:08:59Z
publishDate 2008
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/429912019-04-11T09:29:09Z The production planning and inventory management of finished goods for a pharmaceutical company Gupta, Sumit, M. Eng. Massachusetts Institute of Technology Stephen C. Graves. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2007. Includes bibliographical references (p. 77). This thesis is the result of a three month internship at TCG Pharmaceuticals, Singapore. With the worldwide initiative of lean in TCG, it has implemented the TCG Production System which finds its roots in the famous Toyota Production System. The recognition of the importance of reducing the waste of inventory by TCG is the main motivational force for this internship. This thesis documents the inventory levels of the finished goods in the current production scenario and also analyzes the inventory levels for the future as the production of a new product is aimed to be launched this year. The main purpose of this thesis is to suggest ways to better manage the finished goods inventory at TCG. The future states are modeled using a single stage multi product system and various scenarios are developed. A comparison is made between the TCG's planned production schedule and the production schedules developed based on the different scenarios generated using the model. The performance is measured in terms of the space that is needed in each case to hold the inventory. by Sumit Gupta. M.Eng. 2008-11-07T18:49:28Z 2008-11-07T18:49:28Z 2007 2007 Thesis http://hdl.handle.net/1721.1/42991 232661058 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 77 p. application/pdf Massachusetts Institute of Technology
spellingShingle Mechanical Engineering.
Gupta, Sumit, M. Eng. Massachusetts Institute of Technology
The production planning and inventory management of finished goods for a pharmaceutical company
title The production planning and inventory management of finished goods for a pharmaceutical company
title_full The production planning and inventory management of finished goods for a pharmaceutical company
title_fullStr The production planning and inventory management of finished goods for a pharmaceutical company
title_full_unstemmed The production planning and inventory management of finished goods for a pharmaceutical company
title_short The production planning and inventory management of finished goods for a pharmaceutical company
title_sort production planning and inventory management of finished goods for a pharmaceutical company
topic Mechanical Engineering.
url http://hdl.handle.net/1721.1/42991
work_keys_str_mv AT guptasumitmengmassachusettsinstituteoftechnology theproductionplanningandinventorymanagementoffinishedgoodsforapharmaceuticalcompany
AT guptasumitmengmassachusettsinstituteoftechnology productionplanningandinventorymanagementoffinishedgoodsforapharmaceuticalcompany