Smoothing of pipe system completion processes in a shipyard environment/
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2004.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/44610 |
_version_ | 1811076095015911424 |
---|---|
author | Zojwalla, Shaheen J. (Shaheen Joyab), 1977- |
author2 | Thomas W. Eagar and Arnold Barnett. |
author_facet | Thomas W. Eagar and Arnold Barnett. Zojwalla, Shaheen J. (Shaheen Joyab), 1977- |
author_sort | Zojwalla, Shaheen J. (Shaheen Joyab), 1977- |
collection | MIT |
description | Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2004. |
first_indexed | 2024-09-23T10:16:02Z |
format | Thesis |
id | mit-1721.1/44610 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T10:16:02Z |
publishDate | 2009 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/446102022-01-28T21:32:15Z Smoothing of pipe system completion processes in a shipyard environment/ Zojwalla, Shaheen J. (Shaheen Joyab), 1977- Thomas W. Eagar and Arnold Barnett. Leaders for Manufacturing Program. Leaders for Manufacturing Program at MIT Massachusetts Institute of Technology. Department of Materials Science and Engineering Sloan School of Management Materials Science and Engineering. Sloan School of Management. Leaders for Manufacturing Program. Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Materials Science and Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2004. Includes bibliographical references (p. 63). Due to a number of different production issues, the manufacture of template pipes is often delayed. These delays hold up pipe system completion on board the ships in production and can delay payments from the Ministry of Defense. In order to improve the production of template pipes, a number of changes are recommended to the pipe production processes overall. These include improvements in production planning, along with changes in procurement and scheduling methods. These changes in production methods will result in more material available when it is needed and will therefore improve the manufacture of template pipes. Additionally, they will improve the overall availability of pipes when needed as well as reducing inventory of finished pipes and decreasing the amount of rework. A number of other recommendations to improve the overall pipe manufacture process are also identified, including changes in performance measures, production planning, and other potential areas of improvement. by Shaheen J. Zojwalla. M.B.A. S.M. 2009-02-17T17:25:25Z 2009-02-17T17:25:25Z 2004 2004 Thesis http://hdl.handle.net/1721.1/44610 56029630 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 74 p. application/pdf Massachusetts Institute of Technology |
spellingShingle | Materials Science and Engineering. Sloan School of Management. Leaders for Manufacturing Program. Zojwalla, Shaheen J. (Shaheen Joyab), 1977- Smoothing of pipe system completion processes in a shipyard environment/ |
title | Smoothing of pipe system completion processes in a shipyard environment/ |
title_full | Smoothing of pipe system completion processes in a shipyard environment/ |
title_fullStr | Smoothing of pipe system completion processes in a shipyard environment/ |
title_full_unstemmed | Smoothing of pipe system completion processes in a shipyard environment/ |
title_short | Smoothing of pipe system completion processes in a shipyard environment/ |
title_sort | smoothing of pipe system completion processes in a shipyard environment |
topic | Materials Science and Engineering. Sloan School of Management. Leaders for Manufacturing Program. |
url | http://hdl.handle.net/1721.1/44610 |
work_keys_str_mv | AT zojwallashaheenjshaheenjoyab1977 smoothingofpipesystemcompletionprocessesinashipyardenvironment |