Multiple-part-type production scheduling for high volume manufacturing (token-based approach)
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/46160 |
_version_ | 1811073537071382528 |
---|---|
author | Ng, Sing Hng |
author2 | Stanley B. Gershwin. |
author_facet | Stanley B. Gershwin. Ng, Sing Hng |
author_sort | Ng, Sing Hng |
collection | MIT |
description | Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008. |
first_indexed | 2024-09-23T09:34:12Z |
format | Thesis |
id | mit-1721.1/46160 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T09:34:12Z |
publishDate | 2009 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/461602019-04-12T10:00:53Z Multiple-part-type production scheduling for high volume manufacturing (token-based approach) Ng, Sing Hng Stanley B. Gershwin. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008. Includes bibliographical references (leaf 46). Multiple-part-type production scheduling is a common industrial problem with no generalized solution. In this thesis, a systematic approach is presented to aid in the mentioned production decision making in an actual factory. This strategy involves first generating production targets by optimization followed by a real-time scheduling (token-based) method --- the Control Point Policy. Based on the simulation results, the proposed strategy is able to schedule the production effectively. In addition, it was demonstrated that there was a tradeoff between the amount of inventory and the number of changeovers. Keywords: Multiple-part-type, production scheduling, optimization, token-based Disclaimer: The content of the thesis is modified to protect the real identity of the attachment company. Company name and confidential information are omitted. by Sing Hng Ng. M.Eng. 2009-06-30T17:32:31Z 2009-06-30T17:32:31Z 2008 2008 Thesis http://hdl.handle.net/1721.1/46160 399648635 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 51 leaves application/pdf Massachusetts Institute of Technology |
spellingShingle | Mechanical Engineering. Ng, Sing Hng Multiple-part-type production scheduling for high volume manufacturing (token-based approach) |
title | Multiple-part-type production scheduling for high volume manufacturing (token-based approach) |
title_full | Multiple-part-type production scheduling for high volume manufacturing (token-based approach) |
title_fullStr | Multiple-part-type production scheduling for high volume manufacturing (token-based approach) |
title_full_unstemmed | Multiple-part-type production scheduling for high volume manufacturing (token-based approach) |
title_short | Multiple-part-type production scheduling for high volume manufacturing (token-based approach) |
title_sort | multiple part type production scheduling for high volume manufacturing token based approach |
topic | Mechanical Engineering. |
url | http://hdl.handle.net/1721.1/46160 |
work_keys_str_mv | AT ngsinghng multipleparttypeproductionschedulingforhighvolumemanufacturingtokenbasedapproach |