Multiple-part-type production scheduling for high volume manufacturing (time-based approach)
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/46540 |
_version_ | 1826202916841586688 |
---|---|
author | Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology |
author2 | Stanley B. Gershwin. |
author_facet | Stanley B. Gershwin. Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology |
author_sort | Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology |
collection | MIT |
description | Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008. |
first_indexed | 2024-09-23T12:26:29Z |
format | Thesis |
id | mit-1721.1/46540 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T12:26:29Z |
publishDate | 2009 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/465402019-04-11T00:36:08Z Multiple-part-type production scheduling for high volume manufacturing (time-based approach) Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology Stanley B. Gershwin. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2008. Includes bibliographical references (leaf 44). An effective production scheduling strategy would lead to efficient production line performance as well as increased profit. However, there is no fixed or generalized solution. In this thesis, Nonlinear Programming and time-based Control Point Policy were applied in sequence to solve the production scheduling problems at a high volume industry. The strategy provided the company a systematic way to tackle production problems. A distinct tradeoff between average inventory and frequency of changeover is observed. A recommended selection is made based on minimizing total cost (inventory holding cost and changeover cost). Comparing with current line behavior, the recommended selection will reduce the total cost by more than half. by Zhiyu Xie. M.Eng. 2009-08-26T16:45:44Z 2009-08-26T16:45:44Z 2008 2008 Thesis http://hdl.handle.net/1721.1/46540 417851195 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 57 leaves application/pdf Massachusetts Institute of Technology |
spellingShingle | Mechanical Engineering. Xie, Zhiyu, M. Eng. Massachusetts Institute of Technology Multiple-part-type production scheduling for high volume manufacturing (time-based approach) |
title | Multiple-part-type production scheduling for high volume manufacturing (time-based approach) |
title_full | Multiple-part-type production scheduling for high volume manufacturing (time-based approach) |
title_fullStr | Multiple-part-type production scheduling for high volume manufacturing (time-based approach) |
title_full_unstemmed | Multiple-part-type production scheduling for high volume manufacturing (time-based approach) |
title_short | Multiple-part-type production scheduling for high volume manufacturing (time-based approach) |
title_sort | multiple part type production scheduling for high volume manufacturing time based approach |
topic | Mechanical Engineering. |
url | http://hdl.handle.net/1721.1/46540 |
work_keys_str_mv | AT xiezhiyumengmassachusettsinstituteoftechnology multipleparttypeproductionschedulingforhighvolumemanufacturingtimebasedapproach |