On the structure of operational control systems.
Main Author: | Carroll, Donald C. |
---|---|
Format: | Working Paper |
Published: |
[Cambridge, Mass., M.I.T
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/48633 |
Similar Items
-
DEVELOPMENT AND OPERATION OF A SYNCHRONIZED JOB SHOP PRODUCTION SYSTEM USING FINITE CAPACITY SCHEDULING (FCS) SOFTWARE /
by: Emilda Sayuti, 1990-, author, et al.
Published: (2016) -
DEVELOPMENT AND OPERATION OF A SYNCHRONIZED JOB SHOP PRODUCTION SYSTEM USING FINITE CAPACITY SCHEDULING (FCS) SOFTWARE /
by: Emilda Sayuti, 1990-, author, et al.
Published: (2016) -
Just-in-time needs shop floor control /
by: 294805 Goddard, Walter -
Handbook of production scheduling /
by: Herrmann, Jeffrey W.
Published: (2006) -
A prototype finite scheduling for controlling a flexible manufacturing cell /
by: 301173 Loong, Kenneth Chet Ming
Published: (1997)