China production equipment sourcing strategy

Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2009.

Bibliographic Details
Main Author: Chouinard, Natalie, 1979-
Other Authors: Daniel Whitney and Charles Fine.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2010
Subjects:
Online Access:http://hdl.handle.net/1721.1/51664
_version_ 1811092185784778752
author Chouinard, Natalie, 1979-
author2 Daniel Whitney and Charles Fine.
author_facet Daniel Whitney and Charles Fine.
Chouinard, Natalie, 1979-
author_sort Chouinard, Natalie, 1979-
collection MIT
description Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2009.
first_indexed 2024-09-23T15:14:20Z
format Thesis
id mit-1721.1/51664
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T15:14:20Z
publishDate 2010
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/516642022-01-28T18:20:43Z China production equipment sourcing strategy Chouinard, Natalie, 1979- Daniel Whitney and Charles Fine. Leaders for Manufacturing Program. Leaders for Manufacturing Program at MIT Massachusetts Institute of Technology. Department of Mechanical Engineering Sloan School of Management Mechanical Engineering. Sloan School of Management. Leaders for Manufacturing Program. Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2009. Includes bibliographical references (p. 61-62). This thesis recommends a China business and equipment strategy for the Controls Conveyor Robotics Welding (CCRW) group at General Motors. The current strategy is to use globally common equipment through predetermined global suppliers. The GM facilities in China, which are jointly owned with non-GM entities, believe that a local sourcing strategy would reduce lead times, transportation costs and increase the level of nearby service and support. These factors are catalyst for GM to reevaluate the current global common strategy. This thesis will provide an overview of the CCRW organization and discuss how the sourcing strategy has evolved through globalization. Due to the large variety of production tooling, this thesis will narrow the focus to two case studies: the first being a Main Control Panel (MCP) and the second being a weld controller. These case studies are used as a method to determine the pros and cons of the current sourcing strategy, where the MCP is a highly integrated design maintained by CCRW HQ and the weld controller is a "blackbox" which CCRW defines the functional specifications and procures "off the shelf' from a predetermined global supplier. Through local China visits, literature review and preliminary cost assessments, it was determined that while local sourcing may be a viable option for both the MCP and weld controller, there is not enough determinate information to commit to a sourcing change in the case of the Main Control Panel. From onsite visits to potential MCP option suppliers in China, it appears that likely "local" arrangements exists, however, further company analysis and validation will need to be conducted to adopt the change. (cont.) As for the weld controller, the local product variation with the current global supplier (based locally) is recommended and was validated by CCRW weld engineers by the completion of this internship. I The term "Local" will be used throughout this thesis to refer to "China," meaning solutions that are derived from internal to China. by Natalie Chouinard. M.B.A. S.M. 2010-02-09T16:58:32Z 2010-02-09T16:58:32Z 2009 2009 Thesis http://hdl.handle.net/1721.1/51664 502267228 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 64 p. application/pdf a-cc--- Massachusetts Institute of Technology
spellingShingle Mechanical Engineering.
Sloan School of Management.
Leaders for Manufacturing Program.
Chouinard, Natalie, 1979-
China production equipment sourcing strategy
title China production equipment sourcing strategy
title_full China production equipment sourcing strategy
title_fullStr China production equipment sourcing strategy
title_full_unstemmed China production equipment sourcing strategy
title_short China production equipment sourcing strategy
title_sort china production equipment sourcing strategy
topic Mechanical Engineering.
Sloan School of Management.
Leaders for Manufacturing Program.
url http://hdl.handle.net/1721.1/51664
work_keys_str_mv AT chouinardnatalie1979 chinaproductionequipmentsourcingstrategy