Estimating the Lead Time Distribution of Priority Lots in a Semiconductor Factory

We consider the lead time of priority lots in a semiconductor factory. The main cause of delays is waiting for repairs of failed machines, and the failures are mainly caused by power disturbances. This can be modeled as an exogenous time-dependent failure process, and we develop a probabilistic mode...

Full description

Bibliographic Details
Main Author: Bonvik, Asbjoern M.
Format: Working Paper
Language:en_US
Published: Massachusetts Institute of Technology, Operations Research Center 2004
Online Access:http://hdl.handle.net/1721.1/5226

Similar Items