Estimating the Lead Time Distribution of Priority Lots in a Semiconductor Factory
We consider the lead time of priority lots in a semiconductor factory. The main cause of delays is waiting for repairs of failed machines, and the failures are mainly caused by power disturbances. This can be modeled as an exogenous time-dependent failure process, and we develop a probabilistic mode...
Main Author: | Bonvik, Asbjoern M. |
---|---|
Format: | Working Paper |
Language: | en_US |
Published: |
Massachusetts Institute of Technology, Operations Research Center
2004
|
Online Access: | http://hdl.handle.net/1721.1/5226 |
Similar Items
-
Performance analysis of manufacturing systems under hybrid control policies
by: Bonvik, Asbjoern M. (Asbjoern Margido)
Published: (2005) -
Automated lot dispatching in semiconductor fabrication
by: Roznitsky, Yoel, 1974-
Published: (2014) -
Approximation Algorithms for the Stochastic Lot-Sizing Problem with Order Lead Times
by: Levi, Retsef, et al.
Published: (2014) -
Simulation study of lots with time window constraints in the semiconductor wafer fabrication facility
by: Prasetya, Samuel Juan
Published: (2017) -
Setting optimal production lot sizes and planned lead times in a job shop
by: Yuan, Rong, et al.
Published: (2017)