Estimating the Lead Time Distribution of Priority Lots in a Semiconductor Factory
We consider the lead time of priority lots in a semiconductor factory. The main cause of delays is waiting for repairs of failed machines, and the failures are mainly caused by power disturbances. This can be modeled as an exogenous time-dependent failure process, and we develop a probabilistic mode...
Main Author: | |
---|---|
Format: | Working Paper |
Language: | en_US |
Published: |
Massachusetts Institute of Technology, Operations Research Center
2004
|
Online Access: | http://hdl.handle.net/1721.1/5226 |