Head & base production optimization : inventory management strategy
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/55216 |
_version_ | 1826211624565866496 |
---|---|
author | Guo, Yuming, M. Eng. Massachusetts Institute of Technology |
author2 | Kamal Youcef-Toumi. |
author_facet | Kamal Youcef-Toumi. Guo, Yuming, M. Eng. Massachusetts Institute of Technology |
author_sort | Guo, Yuming, M. Eng. Massachusetts Institute of Technology |
collection | MIT |
description | Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009. |
first_indexed | 2024-09-23T15:08:56Z |
format | Thesis |
id | mit-1721.1/55216 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T15:08:56Z |
publishDate | 2010 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/552162019-04-10T08:41:55Z Head & base production optimization : inventory management strategy Head and base production optimization : inventory management strategy Guo, Yuming, M. Eng. Massachusetts Institute of Technology Kamal Youcef-Toumi. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2009. Cataloged from PDF version of thesis. Includes bibliographical references (p. 49). A new inventory management strategy was developed for Schlumberger to reduce waste in material handling and improve the warehouse receiving efficiency. The current warehouse receiving situation was analyzed; then the receiving procedure was summarized and the time spent for each step was measured. After that, the cause and effect analysis for the low efficient warehouse operation was analyzed and solutions are proposed. The implementation of this model in the company has seen significant improvements in warehouse operation efficiency. The receiving time of specific machined parts has been reduced by 32% and the receiving of specific sub assembled parts has been reduced by 53%. The improvement has led to a cost saving of US$ 422,148. by Yuming Guo. M.Eng. 2010-05-25T21:05:36Z 2010-05-25T21:05:36Z 2009 2009 Thesis http://hdl.handle.net/1721.1/55216 611151983 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 54 p. application/pdf Massachusetts Institute of Technology |
spellingShingle | Mechanical Engineering. Guo, Yuming, M. Eng. Massachusetts Institute of Technology Head & base production optimization : inventory management strategy |
title | Head & base production optimization : inventory management strategy |
title_full | Head & base production optimization : inventory management strategy |
title_fullStr | Head & base production optimization : inventory management strategy |
title_full_unstemmed | Head & base production optimization : inventory management strategy |
title_short | Head & base production optimization : inventory management strategy |
title_sort | head base production optimization inventory management strategy |
topic | Mechanical Engineering. |
url | http://hdl.handle.net/1721.1/55216 |
work_keys_str_mv | AT guoyumingmengmassachusettsinstituteoftechnology headbaseproductionoptimizationinventorymanagementstrategy AT guoyumingmengmassachusettsinstituteoftechnology headandbaseproductionoptimizationinventorymanagementstrategy |