Strategy for reducing the length and variability of aircraft lead time
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Global Operations Program at MIT, 2010.
Main Author: | Bielat, Brendon (Brendon Michael) |
---|---|
Other Authors: | Jonathan Byrnes and Daniel E. Whitney. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/59156 |
Similar Items
-
Framework and strategies for reducing aircraft lead time
by: Marsh, John Andrew, S.M. Massachusetts Institute of Technology
Published: (2014) -
Reducing inventory through supply chain coordination and improved lead times
by: Markham, Randall(Randall Chase)
Published: (2020) -
Reducing wave cycle time at a multi-channel distribution center
by: Wallach, Matthew Reno
Published: (2018) -
Implementation of assembly automation in aircraft structures
by: Eubanks, Zackary R
Published: (2017) -
Lean principles in an aircraft assembly process
by: Aldama, Dora Leanne
Published: (2018)