Screening model optimization for Panay River Basin planning in the Philippines

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2010.

Bibliographic Details
Main Author: Millspaugh, John Henry
Other Authors: Dennis B. McLaughlin.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2011
Subjects:
Online Access:http://hdl.handle.net/1721.1/60770
_version_ 1811092463742353408
author Millspaugh, John Henry
author2 Dennis B. McLaughlin.
author_facet Dennis B. McLaughlin.
Millspaugh, John Henry
author_sort Millspaugh, John Henry
collection MIT
description Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2010.
first_indexed 2024-09-23T15:18:34Z
format Thesis
id mit-1721.1/60770
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T15:18:34Z
publishDate 2011
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/607702019-04-10T22:59:26Z Screening model optimization for Panay River Basin planning in the Philippines Millspaugh, John Henry Dennis B. McLaughlin. Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering. Massachusetts Institute of Technology. Dept. of Civil and Environmental Engineering. Civil and Environmental Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2010. Cataloged from PDF version of thesis. Includes bibliographical references (p. 42-44). The state of the water resources of the Panay River Basin have motivated studies and initial basin planning to mitigate flood damages, to produce hydroelectricity, and to increase irrigated rice areas. The goal of this study was to provide the optimal design parameters for facilities potentially to be placed in the basin and the water management variables associated with operating these facilities. This study considered four reservoirs, four hydropower facilities, and an irrigation facility. Screening model optimization produced results to provide insight for future water resources management in the basin. The modeling was completed in GAMS (General Algebraic Modeling System). by John Henry Millspaugh. M.Eng. 2011-01-26T14:21:40Z 2011-01-26T14:21:40Z 2010 2010 Thesis http://hdl.handle.net/1721.1/60770 693569175 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 95 p. application/pdf a-ph--- Massachusetts Institute of Technology
spellingShingle Civil and Environmental Engineering.
Millspaugh, John Henry
Screening model optimization for Panay River Basin planning in the Philippines
title Screening model optimization for Panay River Basin planning in the Philippines
title_full Screening model optimization for Panay River Basin planning in the Philippines
title_fullStr Screening model optimization for Panay River Basin planning in the Philippines
title_full_unstemmed Screening model optimization for Panay River Basin planning in the Philippines
title_short Screening model optimization for Panay River Basin planning in the Philippines
title_sort screening model optimization for panay river basin planning in the philippines
topic Civil and Environmental Engineering.
url http://hdl.handle.net/1721.1/60770
work_keys_str_mv AT millspaughjohnhenry screeningmodeloptimizationforpanayriverbasinplanninginthephilippines