Financing a National Transmission Grid: What Are the Issues?

The United States requires a substantial investment in transmission capacity over the next several decades. This investment is needed to ensure system reliability, to accommodate growth in demand for electricity, and to allow the integration of significant amounts of renewable generating capacity. I...

Full description

Bibliographic Details
Main Author: Metcalf, Gilbert E.
Format: Working Paper
Language:en_US
Published: MIT Center for Energy and Environmental Policy Research 2011
Online Access:http://hdl.handle.net/1721.1/61775
_version_ 1811079679569821696
author Metcalf, Gilbert E.
author_facet Metcalf, Gilbert E.
author_sort Metcalf, Gilbert E.
collection MIT
description The United States requires a substantial investment in transmission capacity over the next several decades. This investment is needed to ensure system reliability, to accommodate growth in demand for electricity, and to allow the integration of significant amounts of renewable generating capacity. In this paper I survey the need for new transmission capacity and consider the financial and regulatory obstacles that stand in the way of this new investment. This paper makes three points. First, the historical pace of transmission investments will not be adequate to enhance grid reliability or to allow largescale penetration of renewable generating capacity. Second, the replacement of a vertically integrated electric utility industry in many parts of the country by a more disaggregated one composed of merchant generators has added to the challenge of transmission planning and investment. Third, the focus on federal funding for grid improvements is misplaced. There is no evidence that the private sector is incapable of raising the funds needed for critical investment, provided a rationalized regulatory structure is put into place. Making changes to our regulatory and political systems that facilitate transmission investment and siting will not be easy. But the costs of underinvesting in an improved and enlarged national transmission grid are high. Moving to a largely carbon-free economy by the middle of the century will require a transformation of the power system in this country, one that cannot be successful without a strong interstate high-voltage transmission backbone.
first_indexed 2024-09-23T11:18:56Z
format Working Paper
id mit-1721.1/61775
institution Massachusetts Institute of Technology
language en_US
last_indexed 2024-09-23T11:18:56Z
publishDate 2011
publisher MIT Center for Energy and Environmental Policy Research
record_format dspace
spelling mit-1721.1/617752019-04-11T06:59:52Z Financing a National Transmission Grid: What Are the Issues? Metcalf, Gilbert E. The United States requires a substantial investment in transmission capacity over the next several decades. This investment is needed to ensure system reliability, to accommodate growth in demand for electricity, and to allow the integration of significant amounts of renewable generating capacity. In this paper I survey the need for new transmission capacity and consider the financial and regulatory obstacles that stand in the way of this new investment. This paper makes three points. First, the historical pace of transmission investments will not be adequate to enhance grid reliability or to allow largescale penetration of renewable generating capacity. Second, the replacement of a vertically integrated electric utility industry in many parts of the country by a more disaggregated one composed of merchant generators has added to the challenge of transmission planning and investment. Third, the focus on federal funding for grid improvements is misplaced. There is no evidence that the private sector is incapable of raising the funds needed for critical investment, provided a rationalized regulatory structure is put into place. Making changes to our regulatory and political systems that facilitate transmission investment and siting will not be easy. But the costs of underinvesting in an improved and enlarged national transmission grid are high. Moving to a largely carbon-free economy by the middle of the century will require a transformation of the power system in this country, one that cannot be successful without a strong interstate high-voltage transmission backbone. Massachusetts Institute of Technology. Center for Energy and Environmental Policy Research 2011-03-23T19:37:36Z 2011-03-23T19:37:36Z 2010-10 Working Paper 2010-015 http://hdl.handle.net/1721.1/61775 en_US MIT-CEEPR (Series);2010-015 An error occurred on the license name. An error occurred getting the license - uri. application/pdf MIT Center for Energy and Environmental Policy Research
spellingShingle Metcalf, Gilbert E.
Financing a National Transmission Grid: What Are the Issues?
title Financing a National Transmission Grid: What Are the Issues?
title_full Financing a National Transmission Grid: What Are the Issues?
title_fullStr Financing a National Transmission Grid: What Are the Issues?
title_full_unstemmed Financing a National Transmission Grid: What Are the Issues?
title_short Financing a National Transmission Grid: What Are the Issues?
title_sort financing a national transmission grid what are the issues
url http://hdl.handle.net/1721.1/61775
work_keys_str_mv AT metcalfgilberte financinganationaltransmissiongridwhataretheissues