Kaizen events implementation for cycle time reduction in gauge production line

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.

Bibliographic Details
Main Author: Liu, Ren, M. Eng. Massachusetts Institute of Technology
Other Authors: Kamal Youcef-Toumi.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2011
Subjects:
Online Access:http://hdl.handle.net/1721.1/62503
_version_ 1826214052674666496
author Liu, Ren, M. Eng. Massachusetts Institute of Technology
author2 Kamal Youcef-Toumi.
author_facet Kamal Youcef-Toumi.
Liu, Ren, M. Eng. Massachusetts Institute of Technology
author_sort Liu, Ren, M. Eng. Massachusetts Institute of Technology
collection MIT
description Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
first_indexed 2024-09-23T15:59:03Z
format Thesis
id mit-1721.1/62503
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T15:59:03Z
publishDate 2011
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/625032019-04-11T01:04:53Z Kaizen events implementation for cycle time reduction in gauge production line Liu, Ren, M. Eng. Massachusetts Institute of Technology Kamal Youcef-Toumi. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. Cataloged from PDF version of thesis. Includes bibliographical references (p. 62). This thesis describes the implementation of three Kaizen events designed to improve efficiency on a gauge production line which consists of both semiconductor and mechanical equipment for manufacturing complex products with low volume and high configuration mix. A kitting process design reduced cycle time by 12 minutes in the mechanical assembly and by 3 minutes in the packing. A redesigned fixture improved loading and unloading time at the auto calibration. Use of this fixture decreased setup and dismantlement in one batch by 16 minutes. A newly designed jig made multiple loading available in batch of 8 at the vibration test, in which case, 17.5 minutes were reduced from the cycle time. by Ren Liu. M.Eng. 2011-04-25T16:09:56Z 2011-04-25T16:09:56Z 2010 2010 Thesis http://hdl.handle.net/1721.1/62503 712599309 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 71 p. application/pdf Massachusetts Institute of Technology
spellingShingle Mechanical Engineering.
Liu, Ren, M. Eng. Massachusetts Institute of Technology
Kaizen events implementation for cycle time reduction in gauge production line
title Kaizen events implementation for cycle time reduction in gauge production line
title_full Kaizen events implementation for cycle time reduction in gauge production line
title_fullStr Kaizen events implementation for cycle time reduction in gauge production line
title_full_unstemmed Kaizen events implementation for cycle time reduction in gauge production line
title_short Kaizen events implementation for cycle time reduction in gauge production line
title_sort kaizen events implementation for cycle time reduction in gauge production line
topic Mechanical Engineering.
url http://hdl.handle.net/1721.1/62503
work_keys_str_mv AT liurenmengmassachusettsinstituteoftechnology kaizeneventsimplementationforcycletimereductioningaugeproductionline