Manpower planning and cycle-time reduction of a labor-intensive assembly line
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
Main Author: | Oh, Shao Chong |
---|---|
Other Authors: | Stephen C. Graves. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/62504 |
Similar Items
-
Kaizen events implementation for cycle time reduction in gauge production line
by: Liu, Ren, M. Eng. Massachusetts Institute of Technology
Published: (2011) -
Automation as a manpower reduction strategy in navy ships
by: Powers, Roxane (Roxane Bloodworth)
Published: (2016) -
Cycle time reduction of a watch manufacturing line by using cycle time management
by: Chan, Keng Mun.
Published: (2008) -
Production system improvement at a medical devices company : floor layout reduction and manpower analysis
by: AlEisa, Abdulaziz A. (Abdulaziz Asaad)
Published: (2013) -
Housing process and manpower mobilization : locational relationship between labor & industries in developing economies
by: Leung, Hok Lin John
Published: (2013)