Assembly cell layout and Kanban system design for an oilfield services company

Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.

Bibliographic Details
Main Author: Liu, Junying, M. Eng. Massachusetts Institute of Technology
Other Authors: Kamal Youcef-Toumi.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2011
Subjects:
Online Access:http://hdl.handle.net/1721.1/62505
_version_ 1826217453164691456
author Liu, Junying, M. Eng. Massachusetts Institute of Technology
author2 Kamal Youcef-Toumi.
author_facet Kamal Youcef-Toumi.
Liu, Junying, M. Eng. Massachusetts Institute of Technology
author_sort Liu, Junying, M. Eng. Massachusetts Institute of Technology
collection MIT
description Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
first_indexed 2024-09-23T17:03:53Z
format Thesis
id mit-1721.1/62505
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T17:03:53Z
publishDate 2011
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/625052019-04-12T13:27:21Z Assembly cell layout and Kanban system design for an oilfield services company Liu, Junying, M. Eng. Massachusetts Institute of Technology Kamal Youcef-Toumi. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. Cataloged from PDF version of thesis. Includes bibliographical references (p. 46). The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts were proposed based on the categorization. One layout that facilitated the assembly flow best and met the requirement of human factors was selected. This new layout enables the company to meet the increased demand in 2011. In addition, Kanban system was also introduced to this assembly line to reduce lead time to one month and to reduce inventory by 40%, respectively. by Junying Liu. M.Eng. 2011-04-25T16:10:15Z 2011-04-25T16:10:15Z 2010 2010 Thesis http://hdl.handle.net/1721.1/62505 712600997 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 v, 46 p. application/pdf Massachusetts Institute of Technology
spellingShingle Mechanical Engineering.
Liu, Junying, M. Eng. Massachusetts Institute of Technology
Assembly cell layout and Kanban system design for an oilfield services company
title Assembly cell layout and Kanban system design for an oilfield services company
title_full Assembly cell layout and Kanban system design for an oilfield services company
title_fullStr Assembly cell layout and Kanban system design for an oilfield services company
title_full_unstemmed Assembly cell layout and Kanban system design for an oilfield services company
title_short Assembly cell layout and Kanban system design for an oilfield services company
title_sort assembly cell layout and kanban system design for an oilfield services company
topic Mechanical Engineering.
url http://hdl.handle.net/1721.1/62505
work_keys_str_mv AT liujunyingmengmassachusettsinstituteoftechnology assemblycelllayoutandkanbansystemdesignforanoilfieldservicescompany