Assembly cell layout and Kanban system design for an oilfield services company
Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/62505 |
_version_ | 1826217453164691456 |
---|---|
author | Liu, Junying, M. Eng. Massachusetts Institute of Technology |
author2 | Kamal Youcef-Toumi. |
author_facet | Kamal Youcef-Toumi. Liu, Junying, M. Eng. Massachusetts Institute of Technology |
author_sort | Liu, Junying, M. Eng. Massachusetts Institute of Technology |
collection | MIT |
description | Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. |
first_indexed | 2024-09-23T17:03:53Z |
format | Thesis |
id | mit-1721.1/62505 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T17:03:53Z |
publishDate | 2011 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/625052019-04-12T13:27:21Z Assembly cell layout and Kanban system design for an oilfield services company Liu, Junying, M. Eng. Massachusetts Institute of Technology Kamal Youcef-Toumi. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (M. Eng.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2010. Cataloged from PDF version of thesis. Includes bibliographical references (p. 46). The thesis describes the layout design of new gauge assembly lab for an oilfield services company. A relationship diagram was created to categorize all the workstations and activities in the assembly line. Three layouts were proposed based on the categorization. One layout that facilitated the assembly flow best and met the requirement of human factors was selected. This new layout enables the company to meet the increased demand in 2011. In addition, Kanban system was also introduced to this assembly line to reduce lead time to one month and to reduce inventory by 40%, respectively. by Junying Liu. M.Eng. 2011-04-25T16:10:15Z 2011-04-25T16:10:15Z 2010 2010 Thesis http://hdl.handle.net/1721.1/62505 712600997 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 v, 46 p. application/pdf Massachusetts Institute of Technology |
spellingShingle | Mechanical Engineering. Liu, Junying, M. Eng. Massachusetts Institute of Technology Assembly cell layout and Kanban system design for an oilfield services company |
title | Assembly cell layout and Kanban system design for an oilfield services company |
title_full | Assembly cell layout and Kanban system design for an oilfield services company |
title_fullStr | Assembly cell layout and Kanban system design for an oilfield services company |
title_full_unstemmed | Assembly cell layout and Kanban system design for an oilfield services company |
title_short | Assembly cell layout and Kanban system design for an oilfield services company |
title_sort | assembly cell layout and kanban system design for an oilfield services company |
topic | Mechanical Engineering. |
url | http://hdl.handle.net/1721.1/62505 |
work_keys_str_mv | AT liujunyingmengmassachusettsinstituteoftechnology assemblycelllayoutandkanbansystemdesignforanoilfieldservicescompany |