Production flexibility : an empirical analysis of engine build-up at the Boeing Company
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; in conjunction with the Leaders for Global Operations Program at MIT, 2011.
Prif Awdur: | Awe, Adesoji Oluseyi |
---|---|
Awduron Eraill: | Georgia Perakis and Daniel Whitney. |
Fformat: | Traethawd Ymchwil |
Iaith: | eng |
Cyhoeddwyd: |
Massachusetts Institute of Technology
2011
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/1721.1/66061 |
Eitemau Tebyg
-
Improving the Boeing 787 final assembly corrective action process
gan: Sells, Marc Eugene
Cyhoeddwyd: (2014) -
Enterprise design for services : a systems approach for the Boeing next generation corporate travel system architecture
gan: Silva, Hector E
Cyhoeddwyd: (2010) -
New product introduction at a technology company
gan: McLaughlin, Molly Elizabeth
Cyhoeddwyd: (2017) -
Leveraging flexible manufacturing to streamline new product launch processes
gan: Robinson, Taylor K.(Taylor Kristyn)
Cyhoeddwyd: (2020) -
Developing a use case for implementing modular engineering at portfolio companies
gan: Arámbula González, Chen Josué
Cyhoeddwyd: (2018)