Impact of unit commitment constraints on generation expansion planning with renewables
Growing use of renewables pushes thermal generators against operating constraints - e.g. ramping, minimum output, and operating reserves - that are traditionally ignored in expansion planning models. We show how including such unit-commitment-derived details can significantly change energy productio...
主要な著者: | Palmintier, Bryan Stephen, Webster, Mort David |
---|---|
その他の著者: | Massachusetts Institute of Technology. Engineering Systems Division |
フォーマット: | 論文 |
言語: | en_US |
出版事項: |
Institute of Electrical and Electronics Engineers
2012
|
オンライン・アクセス: | http://hdl.handle.net/1721.1/70116 |
類似資料
-
Heterogeneous Unit Clustering for Efficient Operational Flexibility Modeling for Strategic Models
著者:: Palmintier, Bryan S., 等
出版事項: (2016) -
Incorporating operational flexibility into electric generation planning : impacts and methods for system design and policy analysis
著者:: Palmintier, Bryan S. (Bryan Stephen)
出版事項: (2013) -
Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy
著者:: Lourdes Martínez-Villaseñor, 等
出版事項: (2018-01-01) -
A stochastic multiscale model for electricity generation capacity expansion
著者:: Parpas, Panos, 等
出版事項: (2017) -
Regionalized Generation Expansion Planning: Integrating Spatial Constraints
著者:: Radhanon Diewvilai, 等
出版事項: (2024-01-01)