Waiting for TOD : developing in the Millbrae BART Station Area
Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 2012.
Main Author: | Shih, Janet Wei |
---|---|
Other Authors: | P. Christopher Zegras. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/73824 |
Similar Items
-
Defining transit oriented development (TOD) potential along the commuter line stations in Jakarta
by: Hasoloan, Jonathan Todo
Published: (2018) -
Establishing Transit-Oriented Development (TOD) on the ground : case-based analysis of implementing TOD in China
by: Zheng, Ruishan, S.M. Massachusetts Institute of Technology
Published: (2016) -
Financing equitable TOD in Denver, San Francisco, and the rest of the nation
by: Parkhurst, Marcie Elizabeth
Published: (2012) -
Measuring the performance of metro-based Transit Oriented Development (TOD) : a comparative study between Beijing and Singapore
by: Xie, Yiling, M.C.P. Massachusetts Institute of Technology
Published: (2018) -
Contextualizing TOD : fostering inclusive and integrated local spatial planning approaches in Cape Town, South Africa
by: Tareen, Taskina
Published: (2018)