Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation
We present an optimal methodology for synchronized scheduling of production assembly with air transportation to achieve accurate delivery with minimized cost in consumer electronics supply chain (CESC). This problem was motivated by a major PC manufacturer in consumer electronics industry, where it...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2004
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/7458 |
_version_ | 1811090094525775872 |
---|---|
author | Ganesan, Viswanath Kumar Li, Kungpeng Appa Iyer, Sivakumar |
author_facet | Ganesan, Viswanath Kumar Li, Kungpeng Appa Iyer, Sivakumar |
author_sort | Ganesan, Viswanath Kumar |
collection | MIT |
description | We present an optimal methodology for synchronized scheduling of production assembly with air transportation to achieve accurate delivery with minimized cost in consumer electronics supply chain (CESC). This problem was motivated by a major PC manufacturer in consumer electronics industry, where it is required to schedule the delivery requirements to meet the customer needs in different parts of South East Asia. The overall problem is decomposed into two sub-problems which consist of an air transportation allocation problem and an assembly scheduling problem. The air transportation allocation problem is formulated as a Linear Programming Problem with earliness tardiness penalties for job orders. For the assembly scheduling problem, it is basically required to sequence the job orders on the assembly stations to minimize their waiting times before they are shipped by flights to their destinations. Hence the second sub-problem is modelled as a scheduling problem with earliness penalties. The earliness penalties are assumed to be independent of the job orders. |
first_indexed | 2024-09-23T14:33:16Z |
format | Article |
id | mit-1721.1/7458 |
institution | Massachusetts Institute of Technology |
language | English |
last_indexed | 2024-09-23T14:33:16Z |
publishDate | 2004 |
record_format | dspace |
spelling | mit-1721.1/74582019-04-12T08:40:20Z Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation Ganesan, Viswanath Kumar Li, Kungpeng Appa Iyer, Sivakumar Scheduling Supply chain Optimization air transportation We present an optimal methodology for synchronized scheduling of production assembly with air transportation to achieve accurate delivery with minimized cost in consumer electronics supply chain (CESC). This problem was motivated by a major PC manufacturer in consumer electronics industry, where it is required to schedule the delivery requirements to meet the customer needs in different parts of South East Asia. The overall problem is decomposed into two sub-problems which consist of an air transportation allocation problem and an assembly scheduling problem. The air transportation allocation problem is formulated as a Linear Programming Problem with earliness tardiness penalties for job orders. For the assembly scheduling problem, it is basically required to sequence the job orders on the assembly stations to minimize their waiting times before they are shipped by flights to their destinations. Hence the second sub-problem is modelled as a scheduling problem with earliness penalties. The earliness penalties are assumed to be independent of the job orders. Singapore-MIT Alliance (SMA) 2004-12-14T20:33:16Z 2004-12-14T20:33:16Z 2005-01 Article http://hdl.handle.net/1721.1/7458 en Innovation in Manufacturing Systems and Technology (IMST); 365504 bytes application/pdf application/pdf |
spellingShingle | Scheduling Supply chain Optimization air transportation Ganesan, Viswanath Kumar Li, Kungpeng Appa Iyer, Sivakumar Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation |
title | Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation |
title_full | Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation |
title_fullStr | Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation |
title_full_unstemmed | Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation |
title_short | Optimal Methodology for Synchronized Scheduling of Parallel Station Assembly with Air Transportation |
title_sort | optimal methodology for synchronized scheduling of parallel station assembly with air transportation |
topic | Scheduling Supply chain Optimization air transportation |
url | http://hdl.handle.net/1721.1/7458 |
work_keys_str_mv | AT ganesanviswanathkumar optimalmethodologyforsynchronizedschedulingofparallelstationassemblywithairtransportation AT likungpeng optimalmethodologyforsynchronizedschedulingofparallelstationassemblywithairtransportation AT appaiyersivakumar optimalmethodologyforsynchronizedschedulingofparallelstationassemblywithairtransportation |