Planning and Scheduling Decisions in Supply Chains with Multiple Supply Modes: An Integrated Approach
We address the problem of jointly determining shipment planning and scheduling decisions with the presence of multiple shipment modes. We consider long lead time, less expensive sea shipment mode, and short lead time but expensive air shipment modes. Existing research on multiple shipment modes larg...
Main Authors: | Bhatnagar, Rohit, Peeyush, Mehta |
---|---|
Format: | Article |
Language: | English |
Published: |
2004
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/7461 |
Similar Items
- Distribution [electronic journal]
-
Traffic management : planning, operations, and control /
by: 190897 Tyworth, John E., et al.
Published: (1987) -
Risk factors for supply chain management of fast container shipping /
by: Asmawi Ismail, 1972-, et al.
Published: (2009) -
Risk factors for supply chain management of fast container shipping [electronic resource] /
by: Asmawi Ismail, 1972-, et al.
Published: (2009) -
Shipping arrangement information system a case study : Parl Bone Mills /
by: 448504 Mohammad Nazmus Sakeb
Published: (2007)