Effective use of integration mechanisms for complex projects : an empirical analysis of building projects
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.
Main Author: | Dodd, Emily Rose, 1975- |
---|---|
Other Authors: | E. Sarah Slaughter. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/80586 |
Similar Items
-
Validation of the Project Definition Rating Index (PDRI) for MIT building projects
by: Ubach de Fuentes, Pere-Andreu, 1978-
Published: (2005) -
An integrative dynamics approach to project management
by: Sveinsson, Thorarinn
Published: (2007) -
A robust planning and control methodology for design-build fast-track civil engineering and architectural projects
by: Li, Michael In-Chiang, 1975-
Published: (2005) -
Sequential investment planning for complex oil development projects
by: Aydın, Cevat Onur
Published: (2008) -
Peer-to-peer search engine : the Araignee Project
by: Poignant, Pierre, 1975-
Published: (2014)