Reducing reworkable discrepancies through standard work for writing inspection instructions and data distribution
Thesis (M.B.A.)--Massachusetts Institute of Technology, Sloan School of Management; and, (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; in conjunction with the Leaders for Global Operations Program at MIT, 2013.
Main Author: | Bashkoff, Jessica (Jessica Leigh) |
---|---|
Other Authors: | Daniel Whitney and Roy Welsch. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/80990 |
Similar Items
-
Reduction of rework at a large aerospace manufacturer
by: Lieberman, Jeremy A. (Jeremy Alan)
Published: (2012) -
Optimization of shake inspections
by: Geswein, Bradley C. (Bradley Carl)
Published: (2011) -
Identifying internal best practices and propagating standard work
by: Gracewski, Travis E
Published: (2011) -
Standardization of workflow in a large distribution center
by: Greenlee, Stephen Michael.
Published: (2019) -
Weld inspection process improvement
by: Boote, Luke B
Published: (2017)