Resource constrained scheduling problem at U.S. Naval Shipyards
Thesis (S.M. in Naval Architecture and Marine Engineering)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M. in Engineering and Management)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2013.
Main Author: | Nawara, Terrence M. (Terrence Michael) |
---|---|
Other Authors: | Olivier L. de Weck and Mark W. Thomas. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/81615 |
Similar Items
-
Steps towards automatic scheduling of production at the Boston Naval Shipyard
by: Buncher, C. Ralph (Charles Ralph), 1938-
Published: (2018) -
An algorithm for the resource constrained project scheduling problem
by: Johnson, Thomas Joel Russell, 1937-
Published: (2005) -
A genetic algorithm for resource-constrained scheduling
by: Wall, Matthew Bartschi
Published: (2005) -
Converting the Boston Naval Shipyard at Charlestown to civilian uses : easier said than done.
by: Smith, Laura C
Published: (2013) -
An analysis of production policy in U.S. Naval Aviation's Primary Flight training
by: Hanley, Nicholas R. (Nicholas Ryan)
Published: (2021)