Improved capital programming powered by GASB 34 compliance : a case study from Winchester, MA
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2002.
Main Author: | Harrison, V. Tyler (Vestil Tyler), 1980- |
---|---|
Other Authors: | John B. Miller. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/84841 |
Similar Items
-
Developing a GASB compliant asset management tool in Winchester, Massachusetts
by: Messervy, Thomas S. (Thomas Sinclair), 1978-
Published: (2014) -
Methodology for achieving GASB 34 modified approach compliance using U.S. Navy "Smart Base" facility management practices
by: Crafts, Michael D. (Michael David), 1973-
Published: (2014) -
Circulation and mixing in the upper forebay of the Mystic Lake system, Winchester, Masshachusetts
by: Andradóttir, Hrund ÓlÅ f, 1972-
Published: (2005) -
Charters of the New Minster, Winchester
by: Foot, S
Published: (2002) -
The design of a dam at the junction of the upper and lower Mystic Lakes, Winchester, Mass.
by: Vaupel, John L
Published: (2005)