Evaluation framework of construction alternative dispute resolution methods through an integrated model of real options, probabilistic analysis and system dynamics
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 2003.
Main Author: | Majidi, Naz E. (Naz Emilie), 1979- |
---|---|
Other Authors: | Feniosky Peña-Mora. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/85384 |
Similar Items
-
Development of alternative dispute resolution in the Iranian construction industry
by: Saeb, Abdollah, et al.
Published: (2018) -
Alternative dispute resolution as feasible resolution for construction disputes from the perspective of CIDB G7 contractors
by: Zainudin, Farah Ain
Published: (2021) -
Alternative dispute resolution in Malaysia
by: Rashid, Syed Khalid
Published: (2000) -
Alternative dispute resolution in Islam
by: Abdul Hak, Nora, et al.
Published: (2011) -
Using alternative dispute resolution for managing disputes in joint venture construction projects in Malaysia
by: Maidin, Ainul Jaria
Published: (2009)