An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation

Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2001.

Bibliographic Details
Main Author: Cho, Soo-Haeng, 1975-
Other Authors: Steven D. Eppinger.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2005
Subjects:
Online Access:http://hdl.handle.net/1721.1/8607
_version_ 1826204271048130560
author Cho, Soo-Haeng, 1975-
author2 Steven D. Eppinger.
author_facet Steven D. Eppinger.
Cho, Soo-Haeng, 1975-
author_sort Cho, Soo-Haeng, 1975-
collection MIT
description Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2001.
first_indexed 2024-09-23T12:51:39Z
format Thesis
id mit-1721.1/8607
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T12:51:39Z
publishDate 2005
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/86072019-04-11T04:21:08Z An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation Cho, Soo-Haeng, 1975- Steven D. Eppinger. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Massachusetts Institute of Technology. Dept. of Mechanical Engineering. Mechanical Engineering. Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering, 2001. Includes bibliographical references (p. 101-104). This thesis proposes an integrated project management framework for complex engineering projects such as the development of an automobile. The integrated method streamlines project planning and control using three modules: structuring, modeling, and scheduling. In the structuring module, the design structure matrix (DSM) method is used to structure the information flows among tasks and capture the iteration loops. By classifying various types of information dependencies, a critical dependency path is identified and redundant constraints are removed for the modeling and scheduling analyses. In the modeling module, a generalized process model predicts complex behaviors of iterative processes using advanced simulation techniques such as the Latin Hypercube Sampling and parallel discrete event simulation. The model computes the probability distribution of lead time and identifies critical paths in a resource-constrained, iterative project. Using the results of analyses from the structuring and modeling modules, a network-based schedule in the form of a PERT or Gantt chart is developed in the scheduling module. The schedule is used as the basis for monitoring and control of the project. The primary goal of this work is to develop an integrated method that guides project management efforts by improving the effectiveness and predictability of complex processes. The method can also be used for identifying leverage points for process improvements and evaluating alternative planning and execution strategies. Better project management will ultimately result in a better quality product with timely delivery to customers. Two case studies are performed to illustrate the utility of the method. by Soo-Haeng Cho. S.M. 2005-08-23T21:40:18Z 2005-08-23T21:40:18Z 2001 2001 Thesis http://hdl.handle.net/1721.1/8607 49341766 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 124 p. 9360808 bytes 9360566 bytes application/pdf application/pdf application/pdf Massachusetts Institute of Technology
spellingShingle Mechanical Engineering.
Cho, Soo-Haeng, 1975-
An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
title An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
title_full An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
title_fullStr An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
title_full_unstemmed An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
title_short An integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
title_sort integrated method for managing complex engineering projects using the design structure matrix and advanced simulation
topic Mechanical Engineering.
url http://hdl.handle.net/1721.1/8607
work_keys_str_mv AT chosoohaeng1975 anintegratedmethodformanagingcomplexengineeringprojectsusingthedesignstructurematrixandadvancedsimulation
AT chosoohaeng1975 integratedmethodformanagingcomplexengineeringprojectsusingthedesignstructurematrixandadvancedsimulation