Implementation of a system of visual indicators at Intel's D2 Fab
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science, and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2003.
Main Author: | Smith, Erik S. (Erik Sean), 1972- |
---|---|
Other Authors: | Duane S. Boning and Sara L. Beckman. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/87864 |
Similar Items
-
Analysis of new approaches to improve the customer responsiveness of Intel's microprocessor supply chain
by: Chow, Jim, 1972-
Published: (2006) -
Introducing pull methodologies in a semiconductor fab
by: Connally, Jason Walker
Published: (2006) -
Managing preventative maintenance activities at Intel Corporation
by: Fearing, Rebecca Cassler
Published: (2007) -
Reducing variability in equipment availability at Intel using systems optimization
by: Kwong, William W. M
Published: (2006) -
Challenges faced by a global team : the case of the Tool Reuse Program at Intel®
by: Communal, Alain, 1976-
Published: (2008)