Sources and propagation of schedule volatility in an MRP system
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Mechanical Engineering; and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2001.
Main Author: | Greenwood, David R. (David Richard), 1970- |
---|---|
Other Authors: | Stanley B. Gershwin and Yashan Wang. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/88957 |
Similar Items
-
Effective synchronization of MRP to production during a lean transformation
by: Richards, Philip L. (Philip Lloyd)
Published: (2007) -
Management of supply chain costs associated with part proliferation
by: Gerez, David, 1970-
Published: (2014) -
Supply chain design in the volatile semiconductor capital equipment industry
by: Voges, Jens P. (Jens Peter), 1972-
Published: (2009) -
An integrated strategic sourcing process for complex systems
by: Hsu, David T. (David Ta-wei)
Published: (2013) -
In vivo research scheduling and coordination in the pharmaceutical industry
by: Hill, Brent A. (Brent Alan)
Published: (2008)