An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan

In mid-2012, the Mars One program was announced, aiming to build the first human settlement on the surface of Mars. Following a series of precursor missions to develop and deploy key technologies, the first crewed mission would depart Earth in 2024, sending four people on a one-way journey to the su...

Full description

Bibliographic Details
Main Authors: Do, Sydney, Ho, Koki, Schreiner, Samuel Steven, Owens, Andrew Charles, de Weck, Olivier L.
Other Authors: Massachusetts Institute of Technology. Department of Aeronautics and Astronautics
Format: Article
Language:en_US
Published: International Astronautical Federation 2014
Online Access:http://hdl.handle.net/1721.1/90819
https://orcid.org/0000-0002-7453-5046
https://orcid.org/0000-0001-6677-383X
https://orcid.org/0000-0002-9527-7904
_version_ 1826188304382427136
author Do, Sydney
Ho, Koki
Schreiner, Samuel Steven
Owens, Andrew Charles
de Weck, Olivier L.
author2 Massachusetts Institute of Technology. Department of Aeronautics and Astronautics
author_facet Massachusetts Institute of Technology. Department of Aeronautics and Astronautics
Do, Sydney
Ho, Koki
Schreiner, Samuel Steven
Owens, Andrew Charles
de Weck, Olivier L.
author_sort Do, Sydney
collection MIT
description In mid-2012, the Mars One program was announced, aiming to build the first human settlement on the surface of Mars. Following a series of precursor missions to develop and deploy key technologies, the first crewed mission would depart Earth in 2024, sending four people on a one-way journey to the surface of Mars. Additional four-person crews would be sent to Mars at every subsequent launch opportunity to further support and expand the Martian colony. While this program has been received with great fanfare, very little has been published in the technical literature on this mission architecture. As the Mars One mission plan represents a dramatic departure from more conservative exploration approaches, there are many uncertainties in the mission design. The establishment of a colony on Mars will rely on in-situ resource utilization (ISRU) and life support technologies that are more capable than the current state of the art. Moreover, resupply logistics and sparing will play a large role in the proposed colony, though the magnitude and behavior of these two effects is not well understood. In light of this, we develop a Mars settlement analysis tool that integrates a habitat simulation with an ISRU sizing model and a sparing analysis. A logistics model is utilized to predict the required number of launchers and provide a preliminary estimate of a portion of the program cost. We leverage this tool to perform an independent assessment of the technical feasibility of the Mars One mission architecture. Our assessment revealed a number of insights into architecture decisions for establishing a colony on the Martian surface. If crops are used as the sole food source, they will produce unsafe oxygen levels in the habitat. Furthermore, the ISRU system mass estimate is 8% of the mass of the resources it would produce over a two year period. That being said, the ISRU technology required to produce nitrogen, oxygen, and water on the surface of Mars is at a relatively low Technology Readiness Level (TRL), so such findings are preliminary at best. A spare parts analysis revealed that spare parts quickly come to dominate resupply mass as the settlement grows: after 130 months on the Martian surface, spare parts compose 62% of the mass brought from Earth to the Martian surface. The space logistics analysis revealed that, for the best scenario considered, establishing the first crew for a Mars settlement will require approximately 15 Falcon Heavy launchers and require $4.5 billion in funding, and these numbers will grow with additional crews. It is important to note that these numbers are derived only when considering the launch of life support and ISRU systems with spare parts. To capture a more realistic estimate of mission cost, future work should consider development and operations costs, as well as the integration of other key mission elements, such as communications and power systems. Technology development towards improving the reliability of life support systems, the TRL of ISRU systems, and the capability of Mars in-situ manufacturing will have a significant impact on reducing the mass and cost of Mars settlement architectures.
first_indexed 2024-09-23T07:57:37Z
format Article
id mit-1721.1/90819
institution Massachusetts Institute of Technology
language en_US
last_indexed 2024-09-23T07:57:37Z
publishDate 2014
publisher International Astronautical Federation
record_format dspace
spelling mit-1721.1/908192022-09-23T09:52:13Z An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan Do, Sydney Ho, Koki Schreiner, Samuel Steven Owens, Andrew Charles de Weck, Olivier L. Massachusetts Institute of Technology. Department of Aeronautics and Astronautics Massachusetts Institute of Technology. Engineering Systems Division Do, Sydney Do, Sydney Ho, Koki Schreiner, Samuel Steven Owens, Andrew Charles de Weck, Olivier L. In mid-2012, the Mars One program was announced, aiming to build the first human settlement on the surface of Mars. Following a series of precursor missions to develop and deploy key technologies, the first crewed mission would depart Earth in 2024, sending four people on a one-way journey to the surface of Mars. Additional four-person crews would be sent to Mars at every subsequent launch opportunity to further support and expand the Martian colony. While this program has been received with great fanfare, very little has been published in the technical literature on this mission architecture. As the Mars One mission plan represents a dramatic departure from more conservative exploration approaches, there are many uncertainties in the mission design. The establishment of a colony on Mars will rely on in-situ resource utilization (ISRU) and life support technologies that are more capable than the current state of the art. Moreover, resupply logistics and sparing will play a large role in the proposed colony, though the magnitude and behavior of these two effects is not well understood. In light of this, we develop a Mars settlement analysis tool that integrates a habitat simulation with an ISRU sizing model and a sparing analysis. A logistics model is utilized to predict the required number of launchers and provide a preliminary estimate of a portion of the program cost. We leverage this tool to perform an independent assessment of the technical feasibility of the Mars One mission architecture. Our assessment revealed a number of insights into architecture decisions for establishing a colony on the Martian surface. If crops are used as the sole food source, they will produce unsafe oxygen levels in the habitat. Furthermore, the ISRU system mass estimate is 8% of the mass of the resources it would produce over a two year period. That being said, the ISRU technology required to produce nitrogen, oxygen, and water on the surface of Mars is at a relatively low Technology Readiness Level (TRL), so such findings are preliminary at best. A spare parts analysis revealed that spare parts quickly come to dominate resupply mass as the settlement grows: after 130 months on the Martian surface, spare parts compose 62% of the mass brought from Earth to the Martian surface. The space logistics analysis revealed that, for the best scenario considered, establishing the first crew for a Mars settlement will require approximately 15 Falcon Heavy launchers and require $4.5 billion in funding, and these numbers will grow with additional crews. It is important to note that these numbers are derived only when considering the launch of life support and ISRU systems with spare parts. To capture a more realistic estimate of mission cost, future work should consider development and operations costs, as well as the integration of other key mission elements, such as communications and power systems. Technology development towards improving the reliability of life support systems, the TRL of ISRU systems, and the capability of Mars in-situ manufacturing will have a significant impact on reducing the mass and cost of Mars settlement architectures. United States. National Aeronautics and Space Administration (Grant NNX13AL76H) United States. National Aeronautics and Space Administration (Grant NNX14AM42H) Josephine De Karman Fellowship Trust 2014-10-09T13:54:53Z 2014-10-09T13:54:53Z 2014-09 Article http://purl.org/eprint/type/ConferencePaper http://hdl.handle.net/1721.1/90819 Do, Sydney, Koki Ho, Samuel Steven Schreiner, Andrew Charles Owens, and Olivier L. de Weck. "An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan." 65th International Astronautical Congress, Toronto, Canada, September 29-October 3, 2014. https://orcid.org/0000-0002-7453-5046 https://orcid.org/0000-0001-6677-383X https://orcid.org/0000-0002-9527-7904 en_US http://www.iafastro.net/iac/paper/id/24778/summary/ Proceedings of the 65th International Astronautical Congress Creative Commons Attribution-Noncommercial-Share Alike http://creativecommons.org/licenses/by-nc-sa/4.0/ application/pdf International Astronautical Federation Do
spellingShingle Do, Sydney
Ho, Koki
Schreiner, Samuel Steven
Owens, Andrew Charles
de Weck, Olivier L.
An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan
title An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan
title_full An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan
title_fullStr An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan
title_full_unstemmed An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan
title_short An Independent Assessment of the Technical Feasibility of the Mars One Mission Plan
title_sort independent assessment of the technical feasibility of the mars one mission plan
url http://hdl.handle.net/1721.1/90819
https://orcid.org/0000-0002-7453-5046
https://orcid.org/0000-0001-6677-383X
https://orcid.org/0000-0002-9527-7904
work_keys_str_mv AT dosydney anindependentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT hokoki anindependentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT schreinersamuelsteven anindependentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT owensandrewcharles anindependentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT deweckolivierl anindependentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT dosydney independentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT hokoki independentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT schreinersamuelsteven independentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT owensandrewcharles independentassessmentofthetechnicalfeasibilityofthemarsonemissionplan
AT deweckolivierl independentassessmentofthetechnicalfeasibilityofthemarsonemissionplan