Developing metrics for concurrent engineering at Raytheon Company's Surface Radar Group
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Ocean Engineering; and, (S.M.)--Massachusetts Institute of Technology, Sloan School of Management; in conjunction with the Leaders for Manufacturing Program at MIT, 2001.
Autore principale: | Tedesco, Catherine Anne Coles, 1974- |
---|---|
Altri autori: | Henry S. Marcus and Donald B. Rosenfield. |
Natura: | Tesi |
Lingua: | eng |
Pubblicazione: |
Massachusetts Institute of Technology
2014
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/1721.1/91334 |
Documenti analoghi
Documenti analoghi
-
Expedite requests in Raytheon's North Texas supply chain
di: Hiroshige, Scott K. (Scott Kiyoshi), 1977-
Pubblicazione: (2007) -
A lean transformation in low volume space manufacturing
di: Sise, Lincoln J. (Lincoln James), 1974-
Pubblicazione: (2013) -
Concurrently designing a physical production system and an information system in a manufacturing setting
di: Katzen, James Alexander Scott, 1974-
Pubblicazione: (2007) -
The integrated concurrent enterprise
di: Stagney, David B. (David Broderick), 1975-
Pubblicazione: (2013) -
Optimizing the selection and implementation of assembly line equipment at a large automobile original equipment manufacturer
di: Holman, Cale M. (Cale Matthew)
Pubblicazione: (2006)