Robust control of cost impact on fast-tracking building construction projects
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, 1999.
Main Author: | Park, Moonseo, 1967- |
---|---|
Other Authors: | Feniosky Peña-Mora. |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2005
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/9500 |
Similar Items
-
Dynamic planning and control methodology for large-scale concurrent construction projects
by: Park, Moonseo, 1967-
Published: (2005) -
A robust planning and control methodology for design-build fast-track civil engineering and architectural projects
by: Li, Michael In-Chiang, 1975-
Published: (2005) -
Construction management : preliminary cost estimate and scheduling of MIT's Civil and Environmental Engineering building
by: Deshpande, Pushkar V. (Pushkar Vijaykumar), 1977-
Published: (2013) -
Fast track construction of a research development building for multiple users
by: Poh, John Wei Kiang.
Published: (2008) -
Flexibility for improved design : probabilistic quasi-optimization of building life cycle impacts and costs
by: Hester, Joshua C. (Joshua Colón)
Published: (2018)